NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos chain-of-custody, NYC WTC project, 2006

Machine-extracted title · confidence 50%

Asbestos chain-of-custody record for NYC WTC project, including state code reference.

NYC-WTC_000437549–000437661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(3) Asbestos containing materials will not be allowed to accumulate in the work area or on the drop cloth. (4) In lieu of using an exterior chute as per Section 8.4(g), waste bags and containers may be lowered to the waste trailer/dumpster by crane or hoist using a temporary waste transfer container of adequate size and strength. (d) Clean-Up Procedures During Abatement. The following clean-up procedures shall be performed during abatement. (1) Visible accumulations of loose asbestos containing waste material shall be cleaned up using rubber or plastic dustpans and rubber squeegees or HEPA filtered vacuums. Metal shovels may also be used, except in the vicinity of plastic sheeting, critical barriers and isolation barriers, which could be perforated by these tools. To pick up excess water and gross wet debris, a wet-dry HEPA filtered shop vacuum dedicated to asbestos abatement may be used. This cleaning shall be done whenever there is sufficient asbestos waste material to fill a single leak-tight bag/container, or this cleaning shall be done at the end of each work shift whichever shall occur first. Visible debris shall be maintained adequately wet. (2) Work shall stop whenever excessive water accumulation or flooding is present in the area and shall not resume until the water is collected and disposed of properly. (e) Final Cleaning and Clearance Procedures. Final clean-up and clearance procedures for abatement shall comply with Section 56-9, except that only one (1) stage of cleaning (final) is to be performed. Lockdown encapsulant use is not required. (1) Exemption from Project Monitor Visual Inspection. Asbestos projects which are exempt from clearance air sampling requirements at one or two- family owner occupied residential buildings/structures, are also allowed an exemption from the project monitor visual inspection requirements. For asbestos projects utilizing this exemption, once final cleaning is complete, a visual inspection shall be completed by the asbestos abatement contractor’s supervisor to confirm that the scope of abatement work for the asbestos project is complete, and no visible debris/residue, pools of liquid, or condensation remain. The results of this inspection shall be documented by the asbestos abatement contractor’s supervisor in the asbestos abatement contractor daily project log, and once the asbestos project is complete the asbestos abatement contractor’s supervisor shall also obtain the owner’s written acceptance of the final results of the asbestos project within the daily project log. (f) Final Waste Removal From the Site. The requirements of Subpart 56-10 shall apply, once all asbestos project regulated abatement work areas have been completed. 56-11.7 Non-friable Flooring and/or Mastic Removal. The following Phase II abatement procedures shall apply for removal of non-friable asbestos-containing

12 NYCRR56 Subpart 11, Page 108

CITY_21MC100_012001733

NYC-WTC_000437657

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437657Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →