Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

5.01 ACM WASTE REQUIREMENTS

A. The Contractor and all sub-Contractor are specifically alerted to the illegal practice of combining asbestos-containing waste (ACW) from one project with the ACW of other projects without using the services of a permitted waste transfer station as defined by 6 NYCRR Part 360 and 364. As part of the shop drawing submittals, the Contractor must submit for approval the proposed method of transportation and disposal that will be utilized to manage the ACW of this Contract. If a permitted transfer station is to be used, the cost shall be included in the Bid price. The Contractor must submit a waste manifest consistent with whatever approved method is utilized as part of the invoicing and payment procedures.

B. The Contractor shall maintain compliance with the strictest set of regulations of Title 15, Chapter 1 of RCNY, NYC EL 70/85, NYS DOL ICR 56, USEPA, Asbestos Regulation 40CF 61.152, 29 CER 1926.1101, 29 CER 1910.1200 (E) of OSHA’s Hazard Communication Standards, and other applicable standards.

NOTE: Any penalties incurred for failure to comply with any of the above regulations will be the sole responsibility for fines imposed due to negligence of the Contractor.

C. When presenting ACW for storage at the generation site, the Contractor shall:

1. Wet down ACW in a manner sufficient to prevent all visible emissions of dust into the air.

9 Seal material in a leak tight container while wet.

3. Keep ACW separate from any other waste.

D. When presenting ACW for storage away from the site of generation, the Contractor shall:

1. Ensure that ACW has been properly packaged as per requirements above.

9 Examine the containers of ACW to ensure that there are no breaks in the containers and that no visible dust are being released into the air.

3. If examination reveals damage to a container of ACW the Contractor or person accepting the waste shall immediately wet down the ACW and repackage it into a clean leak tight container. The subsequent repackaging shall be the financial responsibility of the Contractor and occur at no extra cost to the City.

4. Keep ACW separate from any other waste.

E. When storing ACW - The Contractor shall:

1. Ensure that the ACW has been sufficiently wetted down in tight container.

02082-78

CITY_21 MCI 00_014563851

NYC-WTC_000454651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →