NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

recover. Absorb spent solvent and associated mastic immediately after use with diatomaceous earth and place in drums dedicated for the disposal of floor tile mastic waste.

e) After completion of mastic removal, thoroughly wash the floor with detergent and rinse clean. Use sufficient quantities of diatomaceous earth to soak up water and detergent so that the waste is completely solid. Place waste in sealed drums dedicated for the disposal of floor tile mastic waste. No bulk mastic residue shall remain on the floor surface following removal and cleaning. It is not necessary to remove stain from pores of concrete.

f) Spent mastic removal agents must be properly stored, categorized and disposed. Refer to "ACM Waste Packing and Load Out Procedures".

g) On completion of floor mastic removal, the floor shall be smooth, free from ridges and bumps, and suitable to receive replacement flooring.

5. Additional Removal Requirements: The Testing Laboratory shall issue a stop work order if visible emissions are detected outside the Work Areas and/or should the airborne fiber concentrations meet or exceed 0.01 f/cc of air or the background count (use the greater of these two values as the reference). Work shall not resume until the condition(s) causing the increase are corrected, surfaces are decontaminated using HEPA vacuums or wet cleaning techniques, and the Contractor receives notice from the Testing Laboratory.

6. Following Removal of ACM Floor Tile and Mastic:

a) HEPA-vacuum all surfaces.

b) All surfaces shall be wet cleaned.

c) Conduct the following activities in accordance with the contract and all applicable laws, codes, rules and regulations.

(1) All waste shall be removed from the Work Area and holding areas.

(2) All tools and equipment are to be removed and decontaminated in the decontamination enclosure system.

d) The Testing Laboratory will conduct a visual observation of the Work Area to verify the absence of asbestos-containing waste CAPITAL PROJECT NUMBER PO79201K 02081-82 100: CONTRACT DOCUMENTS REV. May 3,2000 - 82 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_0 06631331

NYC-WTC_000416843

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416843Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →