Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

and/or mastic is present.

b. Cover walls with one layer of 6-mil polyethylene sheeting, overlapping floor layer a minimum of 12 inches, and seal layer to floor layer. Wall sheeting shall extent to a height of 6-feet from the floor.

(16) Pre-Removal Inspections

a. Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

b. Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

a. Following the Testing Laboratory's approval of the Work Area preparations, removal of ACM may commence.

4. Removal of ACM Floor Tile and Mastic:

a) Prior to actual removal, the floor tiles and associated mastic shall be blanketed and wetted with a minimum 1-inch to 3-inch coating of the acceptable foam or viscous liquid that shall be maintained for the duration of the removal until the material is bagged.

b) Remove floor tile and all underlying layers using a flat hoe or scraper. Remove adhesive backing using approved mastic removal solvent. Do not grind or sand floor.

c) Completely remove floor tile and adhesive backing using appropriate tools and materials. As material is removed, wrap it in two layers of plastic and place it in labeled containers for transport.

d) Completely remove bulk mastic using an approved mastic solvent. Product application shall be in accordance with the manufacturer's instructions and the Material Safety Data Sheet (MSDS) for the product. Do not allow solvent to stand or to be absorbed by sub­ floor. Use diatomaceous earth to prevent the flow of solvent under walls or into other areas from which it would be difficult to CAPITAL PROJECT NUMBER PO79201K 02081-81 100: CONTRACT DOCUMENTS REV. May 3,2000 -81 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_0 06631330

NYC-WTC_000416842

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416842Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →