Asbestos Abatement
exhaust ventilation.
(14) Scaffolds shall be provided for workers engaged in work
that cannot safely be performed from the ground or other
solid Work Area surface.
(15) Work Area Pre-cleaning Procedures: After establishing the
decontamination enclosure systems, prepare and pre-clean
the Work Area as specified below:
a. Movable and loose items not removed by the City
shall be cleaned using HEPA vacuum equipment
and/or wet cleaning methods as appropriate and
shall be removed from the Work Area and stored at
the City's direction.
b. Movable and loose items contaminated with
asbestos shall be removed from the Work Areas and
properly discarded as asbestos-contaminated waste.
c. Eixed objects within the Work Area shall be pre
cleaned using HEPA-vacuum equipment and/or wet
cleaning methods as appropriate. Joints of covers or
casings shall be sealed with tape and fixed objects
enclosed with a minimum of two layers of 6-mil
polyethylene sheeting sealed airtight with tape.
Disassembly of these fixed objects is not required
unless otherwise noted. Fixed objects shall include,
but not be limited to, light fixtures, junction boxes,
hangers and black carrying channels.
d. Prior to being plasticized, the Work Areas shall be
cleaned using HEPA-vacuum equipment and/or wet
cleaning methods as appropriate. Methods that raise
dust, such as dry sweeping or vacuuming with
equipment not equipped with HEPA-filters, shall
not be used.
(15) Plasticize the area after pre-cleaning, using the following
procedure:
a. Cover floor
with one layer of 6-mil polyethylene sheeting,
turning layer a minimum of 12 inches up wall, and
seal layer to wall. Do not apply polyethylene
sheeting to floor of Work Area where floor tiles
CAPITAL PROJECT NUMBER PO79201K 02081-80
100: CONTRACT DOCUMENTS REV. May 3,2000
- 80 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631329
NYC-WTC_000416841
OCR can misread numbers and units. Confirm readings against the page image before using them.