SECTION 02082
d) When volumes greater than or equal to 1,199 liters for a 25 mm filter and/or 2799
liters for a 37 mm filter have been collected and all the TEM samples inside the
abatement area is less than 70 s/mm“ of filter, the abatement work shall be
considered complete without comparing the inside samples to the outside
samples.
e) Remove any visible accumulation of asbestos material and debris. HEPA-
vacuuming and wet cleaning shall be performed on all surfaces inside the work
area. All sealed drums, plastic bags, and equipment used in the work area shall be
removed from the work area.
f) Upon request of the Contractor the Construction Manager will perform a visual
inspection. Evidence of asbestos contamination identified during the inspection
will necessitate further cleaning as heretofore specified.
g) Remove first layer of plastic sheathing inside the work area. The isolation barrier
and decontamination facility shall remain in place and be utilized.
2. Step 2: Second Cleanup:
a) After the first cleaning the work area shall be vacated for 12 hours to allow fibers
to settle. All objects and surfaces in the work area shall be HEPA - vacuumed
and wet cleaned for a second cleaning.
b) A thin coat of lockdown encapsulant shall be applied to all plastic covered
surfaces in the work area.
c) When the encapsulant is dry, second layer of plastic sheets on the walls, ceiling
and floors shall be removed. Do not remove seals from doors, windows, critical
barriers or disconnect the negative pressure equipment.
3. Step 3: Reoccupancy Clearance:
a) Four hours after the second cleanup, all the surfaces in the work area shall be
HEPA - vacuumed and wet cleaned for a third cleaning. Upon the request of the
Contractor, final visual inspection for reoccupancy will be done by the
Construction Manager for the purpose of observing whether cleaned areas are free
of dust, dirt, and debris. Evidence of asbestos contamination identified during the
inspection will necessitate further cleaning as heretofore specified.
b) When the work area passes the Construction Manager visual reoccupancy
inspection, air sampling shall not begin until at least one (1) hour after the area is
dry from the wet cleaning. The testing laboratory shall perform air monitoring
using aggressive testing techniques. Reoccupancy will be approved by the
Construction Manager if the specified fiber count in the work area is achieved
according to the testing laboratory.