Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

All PCM and TEM results must satisfy the clearance criteria for reoccupancy.

d) When volumes greater than or equal to 1,199 liters for a 25 mm filter and/or 2799 liters for a 37 mm filter have been collected and all the TEM samples inside the abatement area is less than 70 s/mm“ of filter, the abatement work shall be considered complete without comparing the inside samples to the outside samples.

e) Remove any visible accumulation of asbestos material and debris. HEPA- vacuuming and wet cleaning shall be performed on all surfaces inside the work area. All sealed drums, plastic bags, and equipment used in the work area shall be removed from the work area.

f) Upon request of the Contractor the Construction Manager will perform a visual inspection. Evidence of asbestos contamination identified during the inspection will necessitate further cleaning as heretofore specified.

g) Remove first layer of plastic sheathing inside the work area. The isolation barrier and decontamination facility shall remain in place and be utilized.

2. Step 2: Second Cleanup:

a) After the first cleaning the work area shall be vacated for 12 hours to allow fibers to settle. All objects and surfaces in the work area shall be HEPA - vacuumed and wet cleaned for a second cleaning.

b) A thin coat of lockdown encapsulant shall be applied to all plastic covered surfaces in the work area.

c) When the encapsulant is dry, second layer of plastic sheets on the walls, ceiling and floors shall be removed. Do not remove seals from doors, windows, critical barriers or disconnect the negative pressure equipment.

3. Step 3: Reoccupancy Clearance:

a) Four hours after the second cleanup, all the surfaces in the work area shall be HEPA - vacuumed and wet cleaned for a third cleaning. Upon the request of the Contractor, final visual inspection for reoccupancy will be done by the Construction Manager for the purpose of observing whether cleaned areas are free of dust, dirt, and debris. Evidence of asbestos contamination identified during the inspection will necessitate further cleaning as heretofore specified.

b) When the work area passes the Construction Manager visual reoccupancy inspection, air sampling shall not begin until at least one (1) hour after the area is dry from the wet cleaning. The testing laboratory shall perform air monitoring using aggressive testing techniques. Reoccupancy will be approved by the Construction Manager if the specified fiber count in the work area is achieved

02082-46

CITY_21 MCI 00_014563902

NYC-WTC_000455973

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455973Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.