NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Summary of City DOF procurement - DEP Title 11

Machine-extracted title · confidence 32%

Table of contents for Title 11 department and DEP-related sections.

NYC-WTC_000340361–000340367
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shut down and the work area shall be wet cleaneu or HEPA vacuumed until the area air samples indicate the fiber concentration is below the determinant level E fiber concentrations remain above the detemtinant level for longer than 24 hours isolation barriers and engineering controls sh^l he instaUed and maintained.

(b) Clearance and/or reoccupancy criteria. (11 The clearance criteria shall be applied to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfactors- when e\ prv sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.

(3) For PCM analysis involved in pre-demolitioji abatement activities, the clearance air monitoring shall be considered satisfactory when every sample is less than or equal to 0.05 l/cc or less than the ambient concentration whichever is larger.

(4) For TEM analysis, the clearance monitoring will be considered satisfactory if conducted in accordance with 40 CFR Pan 763, Subpart E, Appendix A — Section IV— Mandatory Interpretation of Transmission Electron Microscopy Results to Determine Completion of Response .Actions.

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

Subchapter E

Personnel Protection and Equipment Specifications

1 Worker Protection

2 Equipment Specifications

Part 1

Worker Protection

§1-51 Worker Protecticn Requirements

§1-51 Worker Protection Requirements. (.0 Prior to project initiation, all workers engaged in abatement activities on an asbestos project or minor project must be certified by DEP.

(b) At least one asbestos handler supeivisor shall be present at the work site while abatement activities are being conducted on an asbestos project,

CITY_21MC100_009279688

NYC-WTC_000340362

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340362Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →