NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 84 pages

Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 according to the testing laboratory.

c) A minimum of five PCM and five TEM air samples will be collected inside the work area to determine final air clearance reocupancy, provided that the amount of ACM is greater than 160 square feet or 260 linear feet. All PCM and TEM results must satisfy the clearance criteria for reoccupancy.

d) When volumes greater than or equal to 1,199 liters for a 25 mm filter and/or 2,799 liters for a 37 mm filter have been collected and all the TEM samples inside the abatement area is less than 70 s/mm^ of filter, the abatement work shall be considered complete without comparing the inside samples to the outside samples.

e) When the work area passes the reoccupancy test, all controls and seals established shall be removed.

1.31 PAYMENT FOR FINAL AIR TESTING

Final Air Testing Costs:

1. All costs for the first and final air testing following clean-up when ordered by the Commissioner and as required by this Contract and Title 15, Chapter 1 of RCNY shall be borne by the Construction Manager.

2. Retesting:

Should air tests (following final clean-up) indicate a fiber count greater than 0.01 fibers per cubic centimeter (PCM) or the average number of asbestos on TEM samples is greater than 70 s/mm’ of filter, in any of the building areas, the Contractor shall re-clean the specific area. The Construction Manager will then arrange for retesting by the third party laboratory. All costs of such retesting will be at the Contractor's expense. Repeated cycles of cleaning and clearance testing will be performed until a fiber count within the Work Area is equal to or less than 0.01 fibers/cubic centimeter (PCM) and the average number of asbestos structures on TEM samples is no greater than 70s/mm- of filter is attained. The repeated cleaning will be done by the Contractor at no cost to the City. A permanent deduction equal to the cost of additional clearance air testing including all costs incurred by DDC will be made from the Contractor's payment.

1.31 PAYMENT FOR FINAL AIR TESTING

Final Air Testing Costs:

1. All costs for the first and final air testing following clean-up when ordered by the Commissioner and as required by this Contract and Title 15, Chapter 1 of RCNY shall be borne by the Construction Manager.

2. Retesting:

02082-47

CITY_21 MCI 00_014563903

NYC-WTC_000455974

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455974Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →