NYC 9/11 Public Portal Document
SECTION 02082
per cubic centimeter (PCM) or the average number of asbestos on TEM samples is
greater than 70 s/rnnT of filter, in any of the building areas, the Contractor shall re-clean
the specific area. The Construction Manager will then arrange for retesting by the third
party laboratory. All costs of such retesting will be at the Contractor's expense.
Repeated cycles of cleaning and clearance testing will be performed until a fiber count
within the Work Area is equal to or less than 0.01 fibers/cubic centimeter (PCM) and the
average number of asbestos structures on TEM samples is no greater than 70s/mm2 of
filter is attained. The repeated cleaning will be done by the Contractor at no cost to the
City. A permanent deduction equal to the cost of additional clearance air testing
including all costs incurred by DDC will be made from the Contractor's payment.
1.32 COOPERATION WITH TESTING LABORATORY
Representatives of all testing laboratories shall have access to the Work Area at all times. The
Contractor shall provide facilities for such access so that the laboratories may properly perform
its function.
NOTES:
1. No person involved in asbestos abatement work shall be exposed to greater than 8 hour time
weighted average asbestos fiber exposure level or instantaneous ceiling concentrations of
asbestos fibers greater than the limits prescribed in OSHA 29 CFR 1926.1101. Where such
exposures are discovered during testing appropriate measures as prescribed by OSHA 29
CFR 1926.1101 shall be taken.
2. Attention is called to Paragraph 1.32-A2 requiring the Contractor to notify the
Commissioner, Department of Design and Construction within 24 hours of the results of each
test.
3. The discovery of more than 0.01 asbestos fibers/cc or 70 s/mm^ of filter outside of the Work
Area shall be cause for ceasing work immediately. In addition, any breach of a temporary
enclosure (asbestos containment for Work Area) shall be cause for ceasing work until the
breach is repaired, cleaning outside the Work Area is performed as necessary, and air tests
demonstrate that there are 0.01 fiber/cc or less present outside the Work Area. If directed to
cease work pursuant to this paragraph, the City will be held harmless from any claims arising
from a delay in completion of this work experienced by the Contractor.
1.33 TESTING LABORATORY
A. The Laboratory will perform analysis of air samples utilizing phase contrast microscopy
(PCM) and/or transmission electron microscopy (TEM). The Laboratory shall also
perform periodic observations of the Work Site.
B. Observations will include, but not be limited to, checking the standard operating
procedures, engineering control systems, respiratory protection, decontamination
systems, packaging and disposal of asbestos waste, and any other aspects of the project
that may effect the health and safety of the environment. Contractor, and/or facility
02082-48