SECTION 02082
occupants.
C. The Testing Laboratory shall have access to all areas of the asbestos removal project at
all times and shall continuously inspect and monitor the performance of the Contractor to
verify that said performance complies with this Specification. The Testing Laboratory
shall be on site throughout the entire abatement operation.
D. Ata minimum, air sampling shall be conducted in accordance with the following
schedule:
Abatement Activity Pre During Post
Abatement Abatement Abatement
Equal to or greater than 10,000 PCM PCM TEM
square feet or 10,000 linear feet of
ACM
Less than 10,000 square feet or PCM PCM PCM
10,000 linear feet of ACM
Exceptions to the above:
Boiler Rooms PCM PCM
Tent and Glovebag Procedures PCM PCM
Demolitions PCM PCM
Note: TEM is acceptable wherever PCM is required.
E. Prior to commencement of abatement activities, the Testing Laboratory will collect a
minimum number of area samples inside each homogeneous work area.
1. Samples will be taken during normal occupancy activities and circumstances at
the work site.
2. Samplers shall be located within the proposed work area and at all proposed
isolation barrier locations.
3. Samples shall be analyzed using PCM.
4. The number of samples to be collected will be determined by the size of the
project and the abatement methods to be utilized. (Lettering is off again)
E. Frequency and duration of the air sampling during abatement shall be representative of
the actual conditions during the abatement. The size of the asbestos project will be a
factor in the number of samples required to monitor the abatement activities. The
following minimum schedule of samples shall be required daily.
1. Projects Not Solely Employing Glove-Bag and/or Tent Procedures:
02082-49
CITY_21 MCI 00_014563822
NYC-WTC_000454622