NYC 9/11 Public Portal Document
Asbestos Abatement
During Post
Abatement Abatement
Equal to or greater than 10,000 PCM PCM TEM
square feet or 10,000 linear feet of
ACM
Less than 10,000 square feet or PCM PCM PCM
10,000 linear feet of ACM
Exceptions to the above:
Boiler Rooms PCM PCM PCM
Tent and Glovebag Procedures PCM PCM PCM
Demolitions PCM PCM PCM
Note: TEM is acceptable wherever PCM is required.
G. Prior to commencement of abatement activities, the Testing Laboratory will
collect a minimum number of area samples inside each homogeneous work area.
1. Samples will be taken during normal occupancy activities and
circumstances at the work site.
2. Samplers shall be located within the proposed work area and at all
proposed isolation barrier locations.
3. Samples shall be analyzed using PCM.
4. The number of samples to be collected will be determined by the size of
the project and the abatement methods to be utilized.
H. Frequency and duration of the air sampling during abatement shall be
representative of the actual conditions during the abatement. The size of the
asbestos project will be a factor in the number of samples required to monitor the
abatement activities. The following minimum schedule of samples shall be
required daily.
1. Projects Not Solely Employing Glove-Bag and/or Tent Procedures:
a. Two area samples outside the work area in uncontaminated areas
of the building, remote from the decontamination facilities.
b. Primary location selection shall be within 10 feet of isolation
barriers.
c. Where negative ventilation exhaust runs through uncontaminated
CAPITAL PROJECT NUMBER PO79201K 02081-41
100: CONTRACT DOCUMENTS REV. May 3,2000
-41 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631290
NYC-WTC_000416802