Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 representative area samples shall be collected inside and outside the work area for every 5,000 square feet above 25,000 square feet of floor space where ACM has been abated.

P. For post-abatement monitoring, area samples shall conform to the following schedule:

Area Samples for Analysis by Minimum Volume Flow Rate

PCM 1,800 liters 5 to 15 liters/minute TEM 1,250 liters 1 to 10 liters/minute

Q. Each homogeneous work area that does not meet the clearance criteria shall be thoroughly recleaned using wet methods, with the negative pressure ventilation system in operation. New samples shall be collected in the work area as described above. The process shall be repeated until the work site meets the clearance criteria.

R. For an asbestos project with more than one homogeneous work area, the release criterion shall be applied independently to each work area.

S. Should airborne fiber concentrations exceed the clearance criteria, the Contractor shall reclean the work area utilizing wet wiping and HEPA-vacuuming techniques. Following completion of recleaning activities, the Testing Laboratory will perform an observation of the Work Area. If the Testing Laboratory determines that the work was performed in accordance with the specifications, the appropriate settling period will be observed and additional air sampling will be performed.

T. All costs resulting from additional air tests and observations shall be borne by the Contractor. These costs may include, but are not limited to, labor, analysis fees, materials, and expenses.

U. After the area has been found to be in compliance, the Contractor may remove Isolation Barriers and perform final cleaning as specified.

V. Clearance and/or Reoccupancy Criteria

1. The clearance criteria shall be applied to each homogeneous work area independently.

2. For PCM analysis, the clearance air monitoring shall be considered satisfactory when each of the 5 inside/5outside samples for Large Projects and/or 3 inside/3outside samples for Small Projects is less than or equal to 0.01 f/cc or the background concentrations, whichever is greater.

3. For TEM analysis, the clearance air monitoring shall be considered satisfactory when the requirements stated in 40 CFR Part 763, Subpart E, Appendix A, Section IV are met.

4. As soon as the air monitoring tests are completed, the Testing Laboratory will send the results of such tests to the City and notify the Contractor.

02082-53

CITY_21 MCI 00_014563909

NYC-WTC_000455980

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455980Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →