SECTION 02082
Area Samples
for Analysis by Minimum Volume Flow Rate
PCM 1,800 liters 5 to 15 liters/minute
TEM 1,250 liters 1 to 10 liters/minute
Each homogeneous work area that does not meet the clearance criteria shall be thoroughly
recleaned using wet methods, with the negative pressure ventilation system in operation. New
samples shall be collected in the work area as described above. The process shall be repeated
until the work site meets the clearance criteria.
6. For an asbestos project with more than one homogeneous work area, the release criterion
shall be applied independently to each work area.
7. Should airborne fiber concentrations exceed the clearance criteria, the Contractor shall
reclean the work area utilizing wet wiping and HEPA-vacuuming techniques. Following
completion of recleaning activities, the Testing Laboratory will perform an observation
of the Work Area. If the Testing Laboratory determines that the work was performed in
accordance with the specifications, the appropriate settling period will be observed and
additional air sampling will be performed.
8. All costs resulting from additional air tests and observations shall be borne by the
Contractor. These costs may include, but are not limited to, labor, analysis fees,
materials, and expenses.
9. After the area has been found to be in compliance, the Contractor may remove Isolation
Barriers and perform final cleaning as specified.
J. Clearance and/or Reoccupancy Criteria
1. The clearance criteria shall be applied to each homogeneous work area independently.
9 For PCM analysis, the clearance air monitoring shall be considered satisfactory when
each of the 5 inside/5outside samples for Large Projects and/or 3 inside/3outside samples
for Small Projects is less than or equal to 0.01 f/cc or the background concentrations,
whichever is greater.
3. For TEM analysis, the clearance air monitoring shall be considered satisfactory when the
requirements stated in 40 CFR Part 763, Subpart E, Appendix A, Section IV are met.
4. As soon as the air monitoring tests are completed, the Testing Laboratory will send the
results of such tests to the City and notify the Contractor.
P. The Contractor shall cooperate fully with all aspects of air monitoring operations.
1.34 TAMPERING WITH TEST EQUIPMENT
A. All parties to this Contract are hereby notified that any tampering with testing equipment
will be considered an attempt at falsifying reports and records to federal and state