SECTION 02082
5. NIOSH 7400 method using “A” counting rules
M. In accordance with the above criteria, area samples (see NYCDEP Asbestos Control
Program Regulations) shall conform to the following schedule:
Area Samples
for Analysis by Minimum Volume Flow Rate
PCM, 25mm cassettes 560 liters 5 to 15 liters/minute
TEM, 25mm cassettes 560 liters 1 to 10 liters/minute
TEM, 37mm cassettes 1,250 liters 1 to 10 liters/minute
N. Post-abatement clearance air monitoring requirements are as follows:
1. Sampling shall not begin until at least one hour after wet cleaning has been
completed and no visible pools of water or condensation remain.
2. Samplers shall be placed at random around the work area. If the work area
contains the number of rooms equivalent to the number of required samples based
on floor area, a sampler shall be placed in each room. When the number of rooms
is greater than the required number of samples, a representative sample of rooms
shall be selected.
3. The representative samplers placed outside the work area but within the building
shall be located to avoid any air that might escape through the isolation barriers
and shall be approximately 50 feet from the entrance to the work area, and 25 feet
from the isolation barriers.
R. The following aggressive sampling procedures shall be used within the work area during
all clearance air monitoring:
S. Before starting the sampling pumps, use forced air equipment (such as a one horsepower
leaf blower) to direct exhaust air against all walls, ceilings, floors, ledges and other
surfaces in the work area. This pre-sampling procedure shall take at least five minutes per
1,000 square feet of floor area; then
T. Place a 20-inch diameter fan in the center of the room. (Use one fan per 10,000 cubic feet
of room space.) Place the fan on slow speed and point it toward the ceiling.
U. Start the sampling pumps and sample for the required time or volume.
V. Turn off the pump and then the fan(s) when sampling is completed.
W. Collect a minimum number of area samples inside and outside each homogeneous work
area (5 inside/5 outside samples for Large Projects and 3 inside/3 outside samples for
Small Projects). In addition to the minimum for Large Projects, one representative area
samples shall be collected inside and outside the work area for every 5,000 square feet
above 25,000 square feet of floor space where ACM has been abated.
X. For post-abatement monitoring, area samples shall conform to the following schedule:
02082-52
CITY_21 MCI 00_014563825
NYC-WTC_000454625
OCR can misread numbers and units. Confirm readings against the page image before using them.