Asbestos Abatement
4. Mandatory and non-mandatory Electron Microscopy Methods set forth in
40 CFR Part 763, Subpart E, Appendix A.
5. NIOSH 7400 method using "A" counting rules
M. In accordance with the above criteria, area samples (see NYCDEP Asbestos
Control Program Regulations) shall conform to the following schedule:
Area Samples
for Analysis by Minimum Volume Flow Rate
PCM, 25mm cassettes 560 liters 5 to 15 liters/minute
TEM, 25mm cassettes 560 liters 1 to 10 liters/minute
TEM, 37mm cassettes 1,250 liters 1 to 10 liters/minute
N. Post-abatement clearance air monitoring requirements are as follows:
1. Sampling shall not begin until at least one hour after wet cleaning has
been completed and no visible pools of water or condensation remain.
2. Samplers shall be placed at random around the work area. If the work area
contains the number of rooms equivalent to the number of required
samples based on floor area, a sampler shall be placed in each room.
When the number of rooms is greater than the required number of
samples, a representative sample of rooms shall be selected.
3. The representative samplers placed outside the work area but within the
building shah be located to avoid any air that might escape through the
isolation barriers and shall be approximately 50 feet from the entrance to
the work area, and 25 feet from the isolation barriers.
O. The following aggressive sampling procedures shall be used within the work area
during all clearance air monitoring:
1. Before starting the sampling pumps, use forced air equipment (such as a
one horsepower leaf blower) to direct exhaust air against all walls,
ceilings, floors, ledges and other surfaces in the work area. This
pre-sampling procedure shall take at least five minutes per 1,000 square
feet of floor area; then
2. Place a 20-inch diameter fan in the center of the room. (Use one fan per
10,000 cubic feet of room space.) Place the fan on slow speed and point it
toward the ceiling.
3. Start the sampling pumps and sample for the required time or volume.
CAPITAL PROJECT NUMBER PO79201K 02081-44
100: CONTRACT DOCUMENTS REV. May 3,2000
. 44 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631293
NYC-WTC_000416805