CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-44
(i) For asbestos projects: this pre-sampling procedure shall take at
least 5 minutes per 1,000 sq. ft. of floor area; then install one 20-inch fan
per 10,000 cubic feet of room space. Then immediately place the fan on
slow speed and point it toward the ceiling.
(ii) For pre-demolition asbestos abatement activity, this pre-sampling
procedure shall take at least three minutes, after which the 20-inch fan
shall be left running unattended in the work area throughout sampling.
This procedure shall be acceptable when the floor area of the work area
is less than 500 square feet. At or above 500 square feet of floor area
within the work area, the aggressive sampling procedures specified in
this subdivision (d) for asbestos projects shall be conducted.
(2) Start the sampling pumps and sample for the required time or
volume.
(3) Turn off the pump and then the fan(s) when sampling is completed.
(e) For post-abatement monitoring, area samples shall conform to the
following schedule:
Area Samples for
Analysis by Minimum Volume Flow Rate
PCM 1,800 Liters 5 to 15 liters/min.
TEM 1,250 Liters 1 to 10 liters/min.
(f) Each homogeneous work area which does not meet the clearance
criteria shall be thoroughly recleaned using wet methods, with the negative
pressure ventilation system in operation. New samples shall be collected in
the work area as described above. The process shall be repeated until the
work site passes the test.
(g) For an asbestos project with more than one homogeneous work area,
the release criterion shall be applied independently to each work area.
§1 -44 Analysis and Reporting Results. Laboratory analyses and report
ing shall be considered evidence of compliance with this chapter only if they
conform to the following requirements:
(a) PCM area air samples shall be analyzed and reported in accordance _
with the NIOSH 7400 method using “A” Counting Rules.
(b) TEM area air samples shall be analyzed and reported in accordance
with the mandatory or non-mandatory Electron Microscopy Methods set forth
at 40 CFR Part 763, Subpart E, Appendix A.
(c) Bulk samples shall be analyzed and reported in accordance -with
Interim Method for the Determination of Asbestiform Materials in Bulk
Insulation Samples found in 40 CFR Part 763, Subpart F, Appendix A as
amended on September 1, 1982, or other methods approved by the National
Institute of Standards and Technology, the National Institutes of Occupa
tional Safety and Health, the United States Environmental Protection
Agency, or New York State Department of Health.
5775 RCNY 5-31-98
CITY_21MC100_006242967
NYC-WTC_000411836
OCR can misread numbers and units. Confirm readings against the page image before using them.