NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125639
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY 4.4 Aggressive sampling procedures shall be used within the work area for any • and all clearance monitoring. Forced air equipment and fans shall be utilized for this purpose. Prior to starting sampling equipment, forced air equipment shall be used to direct exhaust air against all exposed surfaces of the work area. After running the forced air equipment a minimum of five (5) minutes per 1,000 square feet of area involved, use continuous air movement devices (electrical fans) to continue air movement throughout the area. Twenty (20inch) inch fans shall be used at the rate of one fan per 10,000 cubic feet of room space. The fan(s) shall be placed on a slow speed and pointed at the ceiling.

4.5 Final air clearance samples shall require the collection of a minimum volume of 1,800 liters.

4.6 Any homogenous work area that does not meet the clearance criteria of 0.01 fibers per cubic centimeter (f/cc) shall be thoroughly re-cleaned using wet methods, with negative pressure ventilation systems in operation. Upon completing new samples shall be collected in the manner prescribed above. This process shall be repeated until the work site passes the test.

4.7 The release criterion shall be applied to each work area independently.

5.0 Certificate of Completion

5.1 This shall be delivered by the Certified Asbestos Investigator who shall deems that all visible ACM has been removed from the work area in question. The form shall be issued after all punch lists are fulfilled and work is deemed completed by the on-site inspector.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 61

NYC-WTC 000125639

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125639Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →