Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125640
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY SECTION TEN: ASBESTOS QUANTITY SCHEDULES The following table lists all exposed ACM determined to be present in the subject area: LOCATION FLOOR Basement 2nd Floor 4° Floor 5t Floor 6*Floor 7™Floor 8t Floor gth Floor gtt Floor AREA Boiler Room Boiler Room Pump room At Column D5 Entire Entire Entire Entire Entire South Side Entire Floor Entire Floor ACM TYPE LAB RESULTS ACM QUANTITY NOTES Chimney Access Door Frame Caulk Interior Boiler Lining Perimeter Water Proof Tar 3"x5" Corrugated Pipe Insulation Floor Mastic 2"x4" Corrugated Pipe Insulation 2"X4" Pipe Insulation Elbow insulation 9x9 Floor Tile Green 9x9 Gray Tile Mastic to Gray 9x9 9x9 Floor Tiles 12x12 1°* Layer Mastic 1°t Layer 12X12 F.T. 2d Layer Mastic to 21ª Layer 9X9 F.T. 3'd Layer Mastic 3' Layer 9x9 Floor Tiles Mastic to 9x9 ACM Assumed ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM ACM 1 Door/ 20 LF 800 SF 35 SF: 16 LF 1,000 SF 15 LF 120 LF 3 SF 1,600 SF 3,000 SF 1,500SF 8,000 SF Confirmed ACM Boiler 2 interior Confirmed ACM East side North area Confirmed ACM Confirmed ACM including stairwell landing Remove all layers to substrate at North Side Remove all layers to concrete dock Remove floor tiles & mastic Prepared by JLC Environmental Consultants, Inc. Projoct No. 04-3271 Page 62 NYC-WT C 000125 640

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125640Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →