EPA work plan review, 133-135 and 21-23 buildings, August 2005
Machine-extracted title · confidence 75%
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11, 2005
B. Develop complete and concise specifications to effectively deal with removal of the ACM.
These specifications should be developed to comply with all applicable Federal, State and
Local regulations.
C. Retain the service of an independent testing laboratory to monitor the air for possible
asbestos contamination before, during and after the removal work. Retain all
documentation and correspondence from the removal contractor, the testing laboratory and
related items in a permanent record.
5.0 ASBESTOS QUANTITY SCHEDULE:
Approximate asbestos quantity schedules are presented on the following table:
TABLE I
SUMMARY OF INSPECTION RESULTS FOR ASBESTOS
133-135 GREENWICH STREET
APPROXIMATE
PROPOSED SUSPECT ACM THAT LAB
ACM NOTES/SPECIFIC LOCATION
WORK MAY BE AFFECTED RESULT
QUANTITY
Textured Ceiling ND 0 SF
Carpet Mastic ND 0 SF
Floor Tile Grout (Bath &
ND 0 SF
Lobby)
Floor Tile Grout (Kitchen) ND 0 SF
Bulkhead Tar ACM 10 SF
Tar on HVAC Ducts ND 0 SF
Not Sampled — Previously Confirmed
Flashing ND 35 SF ACM. Material still exists sporadically
along erimeter.
Not Sampled — Previously Confirmed Non-
Roof Material ND 0 SF
ACM
Wall Tile Grout ND 0 SF
Floor Tile Grout (Cellar) ND 0 SF
12" x 12" Tan Floor Tile ND 0 SF Sushi Restaurant
12" x 12" Tan Floor Tile
ND 0 SF Sushi Restaurant
Mastic
Ceiling Tile ND 0 SF
Electric Wire Insulation ND 0 SF
Sheetrock & Joint
ND 0 SF
Compound
Floor Tile Grout (Pizza
ND 0 SF
Sho 1St & Bsmt)
Wall Tile Grout (Pizza
ND 0 SF
Shop 1St & Bsmt)
Ceiling Tile (Pizza Shop) ND 0 SF
Wall Tile Mastic (Indian
ND 0 SF
Rest.)
Tile Grout (Indian Rest.) ND 0 SF
Tile Grout (Shoe Store) ND 0 SF
Wall Tile Glue ND 0 SF
Fiberglass Pipe Insulation N/A 0 LF Non-suspect Material
Pipe insulation in chases and wall cavities
Pipe Insulation in Chases Amount to be is assumed ACM. Material to be tested
PACM
& Wall Cavities determined and amount to be determined once
demolition commences.
Total ApproxImate Quantity of ACM 46 SF