NYC 9/11 Public Portal Document
Regulatory Submittal Part I — Work Plan
Fiterman Hall — 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
Asbestos-containing spandrel beam flashing exists that can only be abated as a
part of the masonry facade deconstruction during the Deconstruction Phase of the
Project. This is a non-friable material that will be removed in strict accordance
with a site-specific NYS DOL Variance. Work area monitoring for asbestos will
be conducted during the removal of this material, and community air monitoring
will be ongoing.
6.5 Operation V - Remediation Work Area Cleanings
After completion of abatement and removal of all interior In-Place ACM,
abatement work area cleanings per ICR-56 will be conducted. Following 2nd and
3 rd cleanings and the settling periods, final air testing will be
conducted as
detailed in Section 6.6 below. Failure of clearance testing will result in re-
cleaning of the work area tested, and re-testing. Upon successful clearance air
testing, the work area will be encapsulated.
6.6 Operation VI— Work Area Clearance
The site will be considered ready for the conventional Deconstruction Phase when
the building, is visually clean of all dust, when interior air clearance testing
indicates that concentrations of the analytes listed below have been reduced to
levels specified below, and when all remaining structural members have been
encapsulated with a colored encapsulant,. All visual clearance and air testing will
be conducted by the Owner's Environmental Consultant. Whereenecessary a
"White Glove Test" will be performed to determine visual clearance.
The building, or portions thereof, can be removed from containment and the
Remediation Phase will be complete when area air measurements, performed
using aggressive air sampling procedures which re-suspend residual settled dusts,
are at or below each of the following airborne concentrations in every sample,
respectively, for the metals noted below and for asbestos. Air testing for asbestos
shall be in accordance with applicable regulations and applicable permits and
variances for this project. If any one sample is above any of these limits, then the
Remediation Phase will be considered incomplete, and the effected areas shall be
re-cleaned and re-tested until the airborne concentrations are at or below the
levels noted for metals and asbestos.
Clearance testing will be conducted by floor, or by isolated area, and will be
acceptable when all samples for a given floor area meet the 70 structures per
square millimeter TEM standard. Clearance testing for metals will be acceptable
when all samples meet the following criteria:
Antimony 250 ug/m3
Barium 250 ug/m3
Beryllium 1.0 ug/m3
NYC-WTC 000096555
OCR can misread numbers and units. Confirm readings against the page image before using them.