Part I: Work Plan — Decontamination/Deconstruction
133-135 Greenwich Street and 21-23 Thames street
Airtek Project 05-0701— Rev 3 September 16, 2005
Utility service is currently cut off to the building. All electricity and water required for
the work will be drawn from sources outside the building.
5.0 Monitoring:
Community Monitoring will be conducted as detailed in submittal Part II — ECAMP.
Cornmu v
Project Monitoring: Throughout the deconnination activities, project air monitoring
will be conducted in addition to the Pecimter Monitoring described above. Project
Monitoring will be conducted in strict accor cc with RCNY Title 15 Chapter 1,
Section 1-41 to 1-45 1 sample analyses will be by TEM. Project _ff ,
monitoring is detail in submi Part II - ECAMP.
0.1n -the prov5i OnS ~~k c - - n the
Clearance Testing will be conducted as detailed in the "Clearance Criteria" section
below, and as detailed in submittal Part II — ECAMP.
6.0 Clearance Criteria:
The site will be considered ready for the Conventional Building Demolition Phase when
the buildings are visually clean of all dust, all interior surfaces have been encapsulated
with a colored encapsulant, and when interior air clearance testing indicates that
concentrations of the analytes listed below have been reduced to levels specified below.
All visual clearance and air testing will be conducted by the environmental consultant.
ere neces "White Glove Test" will be performed to determine visual clearance.."
The buildings can be removed from containment and the abatement phase will be
completed when area air measurements, performed using aggressive air sampling
procedures which re-suspend residual settled dusts, are at or below each of the following
airborne concentrations in every sample, respectively for the metals noted below and for
asbestos. Air testing for asbestos shall be in accordance with applicable regulations and
applicable permits and variances for this project. If any one sample is above any of these
limits, then the abatement phase will be considered incomplete, and the effected areas
shall be re-cleaned and re-tested until the airborne concentrations are at or below the
levels noted for metals and asbestos.
Clearance testing for asbestos will be conducted by floor, and will be acceptable when all
samples for a given floor area meet the 70 structures per square millimeter TEM
standard. Clearance testing for metals will be acceptable when all samples meet the
\o< ( following criteria:
t
Antimony 250 ug/m3
Barium 250 ug/m3
Beryllium 1.0 ug/m3
6 Cadmium 5.0 ug/m3
Chromium (III) 250 ug/m3
ell Copper 500 ug/m3
5
NYC-WTC 000134182
OCR can misread numbers and units. Confirm readings against the page image before using them.