NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 274 pages

EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000134897
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part I: Work Plan — Decontamination/Deconstruction 133-135 Greenwich Street and 21-23 Thames Street Airtek Project 05-0701— Rev 2 August 10, 2005

representative waste will be collected by the Environmental Consultant for analysis by Full TCLP and RCRA characteristics. Based on the results of TCLP testing, the waste will be characterized according to any RCRA exceedances. Disposal will be only to facilities licensed to accept the waste so characterized.

Transportation and Disposal will be as noted above.

8.5 Site Work:

Contractor will perform proper dust control during any demolition or removal work. The procedures too be followed with regards to visible emissions are specified in the ECAMP.

The Contractor will comply with all federal and local laws regarding noise control.

All work will be done by appropriately qualified labor. The Contractor will be responsible for employing qualified tradesmen for the duration of Contractor's contract work on this project.

All work is to be performed in accordance with the latest standards as established by OSHA.

Demolition of a 2-story brick structure, and 5-story brick structure: a. All existing interior garbage, furniture, fixtures, equipment and surfacing materials (plaster/wallboard/ceiling systems, etc.) will have been removed under Phase III above. b. Remove and dispose of existing brick party wall attached to the South side of 120 Cedar Street Work includes patching holes after demolition. Work dots not include waterproofing. c. Complete demolition of above grade structures and ground level framing. Existing foundation wall, vaults and sidewalk will remain. d. Remaining exposed cellar slab will be left free from demolition debris. e. All utilities serving the buildings will be disconnected as required before any removal and/or demolition is started. f. Removal and dispose of roof, flashing and associated roofmg material. g. Obtain and secure all required permits to complete demolition work, including but not limited to demolition permit, fence permit, sidewalk closing permit, etc. Cost for obtaining permits is the responsibility of this trade contractor. h. Upon completion of demolition work, demolition contractor will provide a "berm" along the foundation walls around the perimeter of the site. The berm will be used to temporarily support the foundation walls until the excavation / foundation contractor starts work. The berm will be set on a 45 degree angle and start from the top of existing foundation wall to the cellar slab,

NYC-WTC 000134897

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134897Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →