Part I: Work Plan — Decontamination/Deconstruction
133-135 Greenwich Street and 21-23 Thames Street
Airtek Project 05-0701— Rev 4 September 29, 2005
Contractor will obtain all governmental permits necessary to perform the work
including, but not limited to sidewalk bridges, D.O.T., etc.
Contractor will comply with requirements of all city, state or federal agencies
(including OSHA) relating to the demolition work.
8.2 Dust Suppression:
The Contractor will be responsible to take precautions to prevent fugitive dust
from escaping the site. As noted in the Project HASP, the Contractor has the
responsibility to monitor for visible emissions. Dust suppression engineering
controls will be the responsibility of the Contractor, and may include, but not be
limited to the following:
Wet suppression: The use of water and/or amended water
Site housekeeping via vacuuming/sweeping
Limitation of free-fall of demolition debris
Limitation of freefall during waste loading
Sealed and/or covered transport
The listed controls are intended as a guideline. It is the responsibility of the
Contractor to implement whatever engineering control is required (whether
above-listed or not) to prevent fugitive dust.
Failure to suppress dust that results in visible fugitive emissions from the site
will result in a work stoppage. Work will not be re-started until adequate
corrective measures have been implemented to the satisfaction of the Site
Hygienist. The procedures to be followed with regards to visible emissions
are specified in the ECAMP (Part II of the Submittal).
8.3 Site Protection:
A sidewalk bridge exists along Greenwich and Thames Streets and will remain in
place for the duration of Contractor's work. The sidewalk bridges have been
installed and arc maintained by the LMDC, not the owner of the site. Contractor is
responsible to protect the sidewalk bridge during demolition. In the event a
portion or section of the bridge needs to be removed and/or relocated, contractor
will coordinate this work with the bridge owner (LMDC or Owner).
The Contractor will be responsible for all temporary protection to any adjacent
buildings and/or lots. Contractor will include roof top protection, sidewalk bridges
as required to perform this work.
Contractor will maintain the project site, adjacent sidewalks and streets free from
debris and garbage, including daily sweeping of sidewalks for the duration of
contractor's work.