← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 7 pages

Document ID NYC-WTC_000127729, Phase 1 Decontamination Plan

Machine-extracted title · confidence 80%

Administrative record identifier for the Phase 1 Decontamination Plan binder within DEP Box 52.

NYC-WTC_000127730–000127736

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127734
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mr Rajappan Radhakrishnan — NYC DEP 133-135 Greenwich Street and 21-23 Thames Street Airtek Project 05-0701— June 9, 2005

and bagged for disposal as ACM waste. Remaining structural members will be wet-wiped, HEPA vacuumed, and encapsulated with a penetrating encapsulant. All accessible interstitial spaces will be wet-wiped, HEPA-vacuumed, and encapsulated. Operable windows will be articulated, wet wiped, HEPA- vacuumed, and encapsulated.

Following 2 d and 3`d cleanings and the settling periods, final air testing will be conducted by TEM. Upon successful clearance air testing, the building will be turned over to the demolition contractor for conventional demolition.

Structural Framing:

Due to the impossibility of removing structural framing without the risk of building collapse, all structural framing will be wet-wiped, HEPA vacuumed, and encapsulated with penetrating encapsulant. As a part of the conventional demolition that will follow the decontamination, these materials will be characterized for asbestos content and RCRA characteristics, and will be disposed of as appropriate based on the test results.

Conventional Building Demolition:

Permits:

• Contractor will obtain all governmental permits necessary to perform the work including, but not limited to sidewalk bridges, D.O.T., etc.

Contractor will comply with requirements of any city, state or federal agencies (including OSHA) relating to the demolition work, including the requirements of the New York City Environmental Control Board and the New York City Building Enforcement Safety Team ("BEST Squad"). Contractor will comply with all provisions of the New York City Building Code.

Site Protection:

A sidewalk bridge exists along Greenwich and Thames Streets and will remain in place for the duration of Contractor's work. The sidewalk bridges have been installed and arc maintained by the LMDC, not the owner of the site. Contractor is responsible to protect the sidewalk bridge during demolition. In the event a portion or section of the bridge needs to be removed and/or relocated, contractor will coordinate this work with the owner.

The Contractor will be responsible for all temporary protection to any adjacent buildings and/or lots. Contractor will include rooftop protection, sidewalk bridges as required to perform this work.

NYC-WTC 000127734

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127734Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

21 shared non-person entities · Same agency, volume and box · similarity 0.964

machine-extracted · confidence unavailable · Check page ↗
Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127792

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

21 shared non-person entities · Same agency, volume and box · similarity 0.960

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →