Part!: Work Plan — Decontamination/Deconstruction
133-135 Greenwich Street and 21-23 Thames Street
Airtek Project 05-0701— Rev 3 September 16, 2005
c. Tar — 2(~,sf-
410 2 ~
d. Window Caulk — 9sf 10
e. Coping Stone Caulk —1sf j 0 ~`
f. Pipe Insulation —50 If
Per the requirements of the NYCDEP, these ma als will be abated last in the
decontamination sequence. As such, care taken to protect these materials
from disturbance and/or a soft-strip phase. Pipe insulation will
be removed by NYC DEP loveba ocedures. For detailed information on the
asbestos survey conducted, fer to the Airtek Asbestos Survey Reports
dated May 31, 2005 (Attachment I).
7.4 Structural Framing/Masonry Façade
Due to the impossibility of removing structural framing without the risk of
building collapse, all structural framing, and exposed masonry fagade will be wet-
wiped, HEPA vacuumed, and encapsulated with penetrating encapsulant. Prior to
commencement of conventional demolition, the remaining building components
(anticipated to be principally wood framing and masonry fagade) will be tested by
the Environmental Consultant for ACM content and RCRA characteristics, as
noted in the WMP (Part IV of the submittal). These materials will be handled and
disposed of as appropriate based on the test results.
8.0 Conventional Building Demolition:
8.1 Permits:
Contractor will obtain all governmental permits necessary to perform the work
including, but not limited to sidewalk bridges, D.O.T., etc.
Contractor will comply with requirements of all city, state or federal agencies
(including OSHA) relating to the demolition work. ContractorwiIt5ffip1yWff1i
all pr isin the-New-Yeck-€ityBvilding-Code. -
8.2 Dust Suppression:
The Contractor will be responsible to take precautions to prevent fugitive dust
from escaping the site. As noted in the Project HASP, the Contractor has the
responsibility to monitor for visible emissions. Dust suppression engineering
controls will be the responsibility of the Contractor, and may include, but not be
limited to the following:
Wet suppression: The use of water and/or amended water
Site housekeeping via vacuuming/sweeping
Limitation of free-fall of demolition debris
Limitation of freefall during waste loading