Part I: Work Plan — Decontamination/Deconstruction
133-135 Greenwich Street and 21-23 Thames Street
Airtek Project 05-0701— Rev 3 September 16, 2005
Sealed and/or covered transport
The listed controls are intended as a guideline. It is the responsibility of the
Contractor to implement whatever engineering control is required (whether
above-listed or not) to prevent fugitive dust.
Failure to suppress dust that results in visible fugitive emissions from the site
will result In a work stoppage. Work will not be re-started until adequate
corrective measures have been implemented to the satisfaction of the Site
Hygienist. The procedures to be followed with regards to visible emissions
are specified in the ECAMP (Part II of the Submittal).
8.3 Site Protection:
A sidewalk bridge exists along Greenwich and Thames Streets and will remain in
place for the duration of Contractor's work. The sidewalk bridges have been
installed and arc maintained by the LMDC, not the owner of the site. Contractor is
responsible to protect the sidewalk bridge during demolition. In the event a
portion or section of the bridge needs to be removed and/or relocated, contractor
will coordinate this work with the owner. ?
The Contractor will be responsible for all temporary protection to any adjacent
buildings and/or lots. Contractor will include rooftop protection, sidewalk bridges
as required to perform this work.
Contractor will maintain the project site, adjacent sidewalks and streets free from
debris and garbage, including daily sweeping of sidewalks for the duration of
contractor's work.
Contractor will provide and maintain a plywood fence along Greenwich and
Thames Streets with gates along the front and side of the property. All work to be
coordinated with NYC DOB temporary fence permit. Upon completion of the
Contractor's work, the fence and gates will be left in an acceptable condition, with
gates in locations approved by, and coordinated with, the General Contractor.
General Contractor will obtain fence permit(s) and maintain permit(s) for the
duration of the project. Fence will comply with NYC Department of Building
requirements and will be constructed of minimum 5/8" exterior grade plywood
00 one si ) on two by four frames. Fence will be painted Dark Blue and will
have' ost No Bills" painted a maximum of 10 feet on center. Fence will be
constructed with wood or metal posts at regular intervals. Post will be sunk into
the ground as required to make them free standing without bracing or outriggers.
Fence will be constructed such that sections of it are easily removable without
disturbing remaining sections. Blind spots will not be created on sidewalk.
8.4 Waste Management — Conventional Demolition:
9
NYC-WTC 000134186