NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/BINDER - PHASE 1 DECONTAMINATION PLAN
Document / 20 pages

Asbestos Project Notification Form

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

NYC-WTC_000127792–000127811

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127798
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mr Rajappan Radhakrishnan—NYC DEP 21-23 Thames Street Variance Request Airtek Project 05-0701— June 9, 2005

In order to allow a working space for access/egress, and to keep the S Decontamination facility out of the work area, a preliminary soft strip and clean- up of the 133 Greenwich Street retail store area. This abatement will be conducted according to Subchapter G with a Personnel Decon exterior to the building. Attachment DW will be used to allow the cleaning of the small amount of waste for this preliminary phase. Upon satisfactory Clearance by TEM, this Decon will be dismantled, and a Decon facility will be established in the cleaned entry space to support the balance of the decontamination.

Phase II — Soft Strip:

All interior materials, including moveable objects, will be subject to decontamination and removal or, if porous, will be bagged and disposed of as ACM waste. All ceiling systems (plaster, tiles, sheetrock, etc.), wall systems (plaster, wall board, etc.), and floor systems, (tiles, carpet, etc.) will be removed and bagged for disposal as ACM waste. Remaining structural members, pipes, boiler and freezer boxes will be wet-wiped, HEPA vacuumed, and encapsulated with a penetrating encapsulant. All accessible interstitial spaces will be wet- wiped, HEPA-vacuumed, and encapsulated. Operable windows will be articulated, wet wiped, HEPA-vacuumed, and encapsulated.

Phase III — In Place Interior Friable ACM:

Upon completion of the soft strip phase, interior friable ACM will be abated.

1. Pipe Insulation —50 if

Following 2d and 3 1 cleanings and the settling periods, final air testing will be conducted by TEM. Upon successful clearance air testing, the building will be turned over to the demolition contractor for conventional demolition.

Phase IV - In Place Exterior ACM:

In-place ACM has been identified as follows:

1. Roof Membrane — 350 sf 2. Roof Flashing —100 sf 3. Bulkhead Tar — 20 s£ 4. Window Caulk— 9 sf (2101f) 5. Coping Stone Caulk —1 sf

NYC-WTC 000127798

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127798Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

30 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →