NYC 9/11 Public Portal Document
Mr Rajappan Radhakrishnan—NYC DEP
21-23 Thames Street Variance Request
Airtek Project 05-0701— June 9, 2005
In order to allow a working space for access/egress, and to keep the
S Decontamination facility out of the work area, a preliminary soft strip and clean-
up of the 133 Greenwich Street retail store area. This abatement will be conducted
according to Subchapter G with a Personnel Decon exterior to the building.
Attachment DW will be used to allow the cleaning of the small amount of waste
for this preliminary phase. Upon satisfactory Clearance by TEM, this Decon will
be dismantled, and a Decon facility will be established in the cleaned entry space
to support the balance of the decontamination.
Phase II — Soft Strip:
All interior materials, including moveable objects, will be subject to
decontamination and removal or, if porous, will be bagged and disposed of as
ACM waste. All ceiling systems (plaster, tiles, sheetrock, etc.), wall systems
(plaster, wall board, etc.), and floor systems, (tiles, carpet, etc.) will be removed
and bagged for disposal as ACM waste. Remaining structural members, pipes,
boiler and freezer boxes will be wet-wiped, HEPA vacuumed, and encapsulated
with a penetrating encapsulant. All accessible interstitial spaces will be wet-
wiped, HEPA-vacuumed, and encapsulated. Operable windows will be
articulated, wet wiped, HEPA-vacuumed, and encapsulated.
•
Phase III — In Place Interior Friable ACM:
Upon completion of the soft strip phase, interior friable ACM will be abated.
1. Pipe Insulation —50 if
Following 2d and 3 1 cleanings and the settling periods, final air testing will be
conducted by TEM. Upon successful clearance air testing, the building will be
turned over to the demolition contractor for conventional demolition.
Phase IV - In Place Exterior ACM:
In-place ACM has been identified as follows:
1. Roof Membrane — 350 sf
2. Roof Flashing —100 sf
3. Bulkhead Tar — 20 s£
4. Window Caulk— 9 sf (2101f)
5. Coping Stone Caulk —1 sf
•
NYC-WTC 000127798