NYC 9/11 Public Portal Document
Mr Rajappan Radhakrishnan — NYC DEP
133-135 Greenwich Street Variance Request
Airtek Project 05-0701— August 11, 2005
Exterior:
We are requesting a variance from the following subsections to facilitate the
decontamination of the facade:
Section 1-81(j) No pre-cleaning of the work area(s)
Section 1-81(m) Partial plasticization of the work area(s)
Section 1-82(a) & 1-83(a) Remote decontamination facilities
Section 1-91 No negative air
Section 1-112(d) & 1-112(e) No l & 2nd settling period and no 2nd & 3rd cleaning
The exterior of the building was decontaminated as a part of the NYC DEP Building
Exterior Cleaning Program following 9/11/01. Airtek's visual inspection of the facade
indicates that it is advisable to conduct low-pressure power washing prior to initialing
demolition activities. The exterior of the building will be cleaned in accordance with the
NYC DEP WTC Dust/Residue Roof & Facade Cleaning Procedures.
Interior:
Phase 1— Soft Strip:
We are requesting a variance from the following subsections:
Section 1-125(i) Isolation Barriers
We request relief from 1-125(i): Isolation Barriers. It is the intent of the project to seal all
windows and communicating openings to the outside of the building from the outside
with two layers of 6-mil poly and plywood barriers. The intent of this action is to create a
sealed structure that will allow decontamination activities within the building while
reducing the possibility of migration of dust to the outside of the structure.
All interior materials, including moveable objects, will be subject to decontamination and
removal or, if porous, will be bagged and disposed of as ACM waste. All ceiling systems
(plaster, tiles, sheetrock, etc.), wall systems (plaster, wall board, etc.), and floor systems,
(tiles, carpet, etc.) will be removed and bagged for disposal as ACM waste. Remaining
structural members, pipes, boiler, freezer boxes and roof mounted HVAC units will be
wet-wiped, HEPA vacuumed, and encapsulated with a penetrating encapsulant. All
accessible interstitial spaces will be wet-wiped, HEPA-vacuumed, and encapsulated.
Operable windows will be articulated, wet wiped, HEPA-vacuumed, and encapsulated.
Full worker and waste decontamination facilities will be attached to the entrance on
Thames Street. The decontamination facilities will comply with NYC DEP Title 15 §1-
82 & §1-83.
Phase II- In Place Exterior ACM:
We are requesting a variance from the following subsections for the roofing materials:
Section 1-41(c) During abatement air sampling inside the work area---__~
Section 1-41(d) No post abatement clearance air monitoring
Section 1-102(b) Not to fully saturate ACRM with amended water
ENVIRONMENTAL CONSULTANTS
NYC-WTC-000134902
OCR can misread numbers and units. Confirm readings against the page image before using them.