NYC 9/11 Public Portal Document
Exterior:
We are requesting a variance from the following subsections to facilitate the decontamination of
the facade:
Section 1-81(j) No pre-cleaning of the work area(s)
Section 1-81(m) Partial plasticization of the work area(s)
Section 1-82(a) & 1-83(a) Remote decontamination facilities
Section 1-91 No negative air
1st
Section 1-112(d) & 1-112(e) No & 2nd settling period and no
2nd
& 3rd cleaning
The exterior of the building was decontaminated as a part of the NYC DEP Bjil1 Exterior
Cleaning Program following 9/11/01. Airtek's visual inspection of the qndé indicates that it is
advisable to conduct low-pressure power washing prior to initialing emolition activities. The
exterior of the building will be cleaned in accordance with the NYC DEP WTC Dust/Residue
Roof & Façade Cleaning Procedures.
Interior:
Phase 1 loft Strip:
We are requesting a variance from the following subsections:
Section 1-125(i) Isolation Barriers
We request relief from 1-125(i): Isolation Barriers. It is the intent of the project to seal all
windows and communicating openings to the outside of the building from the outside with two
layers of 6-mil poly and plywood barriers. The intent of this action is to create a sealed structure
that will allow decontamination activities within the building while reducing the possibility of
migration of dust to the outside of the structure.
All interior materials, including moveable objects, will be subject to decontamination and
removal or, if porous, will be bagged and disposed of as ACM waste. All ceiling systems
(plaster, tiles, sheetrock, etc.), wall systems (plaster, wall board, etc.), and floor systems, (tiles,
carpet, etc.) will be removed and bagged for disposal as ACM waste. Remaining structural
members, pipes, boiler and freezer boxes will be wet-wiped, HEPA vacuumed, and encapsulated
with a penetrating encapsulant. All accessible interstitial spaces will be wet-wiped, HEPA-
vacuumed, and encapsulated. Operable windows will be articulated, wet wiped, HEPA-
vacuumed, and encapsulated. Full worker and waste decontamination facilities will be attached
to the entrance on Thames Street. The decontamination facilities will comply with NYC DEP
Title 15 §1-82 & §1-83. fL2 " A \ c '-" 1 +o be USQA &V i rs 4-€-- ;A
u.dC .A
c4 cti,lg pie - ) e-49 A-+;, be 4~
Phase II — In Place Interior Friable ACM: a,Pob~ 9\( on
Upon completion of the soft strip phase, interior friable ACM will be abated.
1. Pipe Insulation — 50 If
Following 2nd and 3rd cleanings and the settling periods, final air to g~11 conducted by
TEM. Upon successful clearance air testing, the building will be turned over to the demolition
contractor for conventional demolition.
Phase III - In Place Exterior ACM:
We are requesting a variance from the following subsections for the roofing materials:
NYC-WTC 000134221