NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan
133-135 Greenwich & 21-23 Thames Streets
Airtek Project 05-0701 — Rev 1 August 11, 2005
Environmental Community Air Monitoring
1.0 General:
Environmental air monitoring and visual observation will be conducted during the
abatement and demolition of the buildings located at the 133-135 Greenwich Street/21-23
Thames Street site (The Site). The proposed program consists of two primary forms of
environmental monitoring: Work Area Monitoring required by law for environmental
remediation projects and intended to monitor the efficacy of project engineering controls;
and voluntary Community Monitoring intended to gauge and document the impact (or
lack thereof) of the project to the surrounding area.
1.1 Operations to be Monitored
The project schedule for The Site includes four weeks of soft-strip contaminants
of potential concern (COPCs) abatement and removal, asbestos abatement and
removal under a variance from the NYCDEP, and four weeks of conventional
demolition. All work will be monitored for visible emissions by the
Environmental Consultant's Site Hygienist. The Abatement Phase regulated under
NYC DEP will be monitored under both a Community Air Monitoring Program,
and a Work Area Monitoring Program. The Demolition phase of the project will
be monitored under the Community Air Monitoring Program. All air monitoring
conducted under this plan will be conducted by the Environmental Consultant's
New York State DOL certified air sample technicians under the supervision of the
Environmental Consultant's Certified Industrial Hygienist (CIH).
1.2 Project Monitoring
Monitoring of this project will include all standard monitoring functions for
environmental remediation projects including observations for visible emissions,
air sampling and analyses, inspection and monitoring of the contractor's work
practices, and reporting to the Owner and the Regulators. These general
monitoring functions will be applied to both the Abatement Phase and Demolition
Phase of this project.
1.3 Neighboring Properties
The Environmental Community Monitoring Plan described in this document is
intended to address the impact of the project to the surrounding area. In addition
to that effort, properties directly adjacent to the project site have been given
particular attention by this plan.
1.3.1 Trinity Place Schools
NYC-WTC 000134943
OCR can misread numbers and units. Confirm readings against the page image before using them.