Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005
Extensive effort and cost has been invested in working with the NYC Department of Education to provide engineering controls and testing support to protect the educational facilities at 100 and 90 Trinity Place. Detailed information on these efforts is included in Attachment II to Part I of this submittal - “Work Plan.”
1.3.2 125 Greenwich Street
Specific measures are planned to monitor the impact of the project on the 125 Greenwich Street building. One of the Environmental Community Air Monitoring stations specified in this document (school auditorium roof station) is directly adjacent to this building (within 20’). In addition, the Environmental Consultant will conduct Abatement Phase work area monitoring continuously during abatement phase work shifts between the project site and the 125 Greenwich Street building.
1.3.3 Bldg. South of Thames Street
This building, across Thames Street from the Project Site, will be separated from the project site by two Envhonmental Community Ail- Monitoring stations. In addition, during the Abatement Phase, extensive work area monitoring will be conducted on Thames Street.
1.4 Environmental Sampling and Analytical Methodologies
Sampling and analytical methodologies utilized for this Project, will comply with published protocols from EPA and/or National Institute of Occupational Safety and Health (“NIOSH”). Where appropriate other published standards may be substituted and project-specific adjustments to protocols may be made. Generally, sampling will be conducted once every 24-hour work period, except for asbestos (TEM samples), which will be taken for the duration of every work shift and once a day during non-work days during the abatement phase. Real-time particulate monitoring will be on a continuous basis. Instantaneous mercury readings will be obtained to evaluate the air quality around the work site at multiple locations each work day.
2.0 Visible emissions
2.1 Abatement Phase
At the commencement of each work shift, the Environmental Site Hygienist will conduct a thorough inspection of all engineering control systems including containment barriers, and negative air control systems, and exterior. If any visible emission is noted on the exterior of the work area, all work will be stopped and not restarted until an evaluation of engineering controls has identified and corrected the cause of the emission. The evaluation may include, but is not limited
4
CITY_DEP_WORBY_CANNATA_SUBP_000087249
NYC-WTC_000232130
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
26 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
38 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
38 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140626
Draft scope of work for WTC debris/dust residential cleanup program with compliance requirements and regulatory overview.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Trinity Place · 1 pages · confidence 0.15 · verify page 3
- 125 Greenwich Street · 1 pages · confidence 0.15 · verify page 4
- 133-135 Greenwich Street · 3 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
Similar indexed content
NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
Similar indexed content
Similar indexed content
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similar indexed content