NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 38 pages

NYC-WTC_000232127

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000232127–000232164
Page image
Scanned page image, NYC-WTC_000232131
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005

to, work activities and smoke testing of the isolation barriers. Any damaged or malfunctioning engineering control will be repaired immediately. The work will not be restarted until engineering controls are repaired or determined to be functioning properly.

2.2 Demolition Phase

During each work shift, the Environmental Consultant will observe demolition operations to monitor visible dust in the air and suppression measures being applied by the demolition contractor. The Environmental Consultant may, depending on the severity and duration of dust condition, order a stoppage of the work or require modified work practices to reduce visible dust.

2.3 Notification

The EPA Region 2 office and NYCDEP will be notified as promptly as reasonably possible of any visible emission observed by the Environmental Consultant to cross the property line of the Buildings. The Environmental Consultant will promptly advise the EPA Region 2 office and the NYCDEP of the corrective actions taken. A report of inspection results and corrective actions taken will be provided to the EPA Region 2 office and NYCDEP within 2 business days of any incident showing any visible emissions.

3.0 Abatement Phase Air Monitoring 3.1 Visible Emissions

Monitoring for visible emissions will be conducted as described above in Section 2.0 of this specification.

3.2 Community Air Monitoring

Prior to the commencement of any site work, one week of background community air monitoring will be conducted as detailed in Table 7 - Community Air Monitoring in Attachment A (Community Monitoring) to this specification. Community Air Monitoring as detailed in Table 1 will continue through the Abatement Phase and until completion of the Demolition Phase.

Community Monitoring locations are identified on the drawing included in Attachment C (Community Monitoring L.ocations) to this specification. The locations include the roof of the school auditorium on Cedar Street, the sidewalk bridge on Thames Street, and at ground level at the intersection of Thames and Greenwich Streets.

If the environmental air monitoring locations need to be changed during the abatement phase due to site conditions, NYC DEP and USEPA Region 2 office

5

CITY_DEP_WORBY_CANNATA_SUBP_000087250

NYC-WTC_000232131

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000232131Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →