NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005
to, work activities and smoke testing of the isolation barriers. Any damaged or malfunctioning engineering control will be repaired immediately. The work will not be restarted until engineering controls are repaired or determined to be functioning properly.
2.2 Demolition Phase
During each work shift, the Environmental Consultant will observe demolition operations to monitor visible dust in the air and suppression measures being applied by the demolition contractor. The Environmental Consultant may, depending on the severity and duration of dust condition, order a stoppage of the work or require modified work practices to reduce visible dust.
2.3 Notification
The EPA Region 2 office and NYCDEP will be notified as promptly as reasonably possible of any visible emission observed by the Environmental Consultant to cross the property line of the Buildings. The Environmental Consultant will promptly advise the EPA Region 2 office and the NYCDEP of the corrective actions taken. A report of inspection results and corrective actions taken will be provided to the EPA Region 2 office and NYCDEP within 2 business days of any incident showing any visible emissions.
3.0 Abatement Phase Air Monitoring 3.1 Visible Emissions
Monitoring for visible emissions will be conducted as described above in Section 2.0 of this specification.
3.2 Community Air Monitoring
Prior to the commencement of any site work, one week of background community air monitoring will be conducted as detailed in Table 7 - Community Air Monitoring in Attachment A (Community Monitoring) to this specification. Community Air Monitoring as detailed in Table 1 will continue through the Abatement Phase and until completion of the Demolition Phase.
Community Monitoring locations are identified on the drawing included in Attachment C (Community Monitoring L.ocations) to this specification. The locations include the roof of the school auditorium on Cedar Street, the sidewalk bridge on Thames Street, and at ground level at the intersection of Thames and Greenwich Streets.
If the environmental air monitoring locations need to be changed during the abatement phase due to site conditions, NYC DEP and USEPA Region 2 office
5
CITY_DEP_WORBY_CANNATA_SUBP_000087250
NYC-WTC_000232131
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
26 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
38 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
38 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140626
Draft scope of work for WTC debris/dust residential cleanup program with compliance requirements and regulatory overview.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Trinity Place · 1 pages · confidence 0.15 · verify page 3
- 125 Greenwich Street · 1 pages · confidence 0.15 · verify page 4
- 133-135 Greenwich Street · 3 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
Similar indexed content
NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
Similar indexed content
Similar indexed content
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similar indexed content
Similar indexed content