Mr. Pat Evangelista — Response to Comments
133-135 Greenwich Street21-23 Thames Street
Airtek Project 05-0701— August 11, 2005
14. Work Plan has been revised and re-formatted to state that the exterior low-
pressure wash will occur as the first operation of the Abatement Phase. See
7.1
15. The Phase I Access Facility will no longer be used. Decons will be built on
Thames Street outside the buildings. This section has been deleted.
16. Ditto.
17. Ditto.
18. In-Place ACM is abated last in the decontamination sequence per NYCDEP
requirements. There is very little of this material on the interior of the building
(50 linear feet), and its location is known. Care will be taken to prevent
disturbance and/or damage to this material during the soft-strip that proceeds
its abatement. Wording added at end of 7.3.
19. Section 7.0 has been edited.
20. Caulking has been sampled. Results Pending.
21. Subsection revised as noted.
22. 7.2 revised as noted.
23. 7.2 revised as noted.
24. 7.2 revised to refer to "WMP."
25. 7.2 revised to refer to "ECAMP."
26. Subsection revised as noted.
27. Subsection 7.4 revised to refer to "Waste Management Plan."
28. Waste Management Plan submitted as Part IV of submittal.
29. Waste management discussion moved to Part IV WMP of submittal.
30. Requirement included in WMP.
31. A waste management plan has been attached as Part IV of the submittal.
32. Ditto
33. Ditto