Asbestos Project Notification Form

Machine-extracted title · confidence 90%

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

NYC-WTC_000127779–000127790

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN

Page image
Scanned page image, NYC-WTC_000127784
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mr Rajappan Radhakrishnan — NYC DEP 133-135 Greenwich Street Variance Request Airtek Project 05-0701— June 9, 2005

• Antimony 250 ug/m3 Barium 250 ug/m3 Beryllium 1.0 ug/m3 Cadmium 5.0 ug/m3 Chromium (III) 250 ug/m3 Copper 500 ug/m3 Lead 25 ug/m3 Manganese 100 ug/m3 Mercury 12.5 ug/m3 Nickel 50 ug/m3 Zinc 1,000 ug/m3

Exterior.

The exterior of the building was decontaminated as a part of the NYC DEP Building Exterior Cleaning Program following 9/11/01. Airtek's visual inspection of the facade indicates that it is advisable to conduct low-pressure power washing prior to initialing demolition activities. The exterior of the building will be cleaned in accordance with the NYC DEP WTC Dust/Residue Roof & Façade Cleaning Procedures (attached).

. Interior:

Phase 1— Access Facility:

In order to allow a working space for access/egress, and to keep the Decontamination facility out of the work area, a preliminary soft strip and clean- up of the 133 Greenwich Street retail store area. This abatement will be conducted according to Subchapter G with a Personnel Decon exterior to the building. Attachment DW will be used to allow the cleaning of the small amount of waste for this preliminary phase. Upon satisfactory Clearance by TEM, this Decon will be dismantled, and a Decon facility will be established in the cleaned entry space to support the balance of the decontamination.

Phase II— Soft Strip:

All interior materials, including moveable objects, will be subject to decontamination and removal or, if porous, will be bagged and disposed of as ACM waste. All ceiling systems (plaster, tiles, sheetrock, etc.), wall systems (plaster, wall board, etc.), and floor systems, (tiles, carpet, etc.) will be removed and bagged for disposal as ACM waste. Remaining structural members, pipes, boiler, freezer boxes and roof mounted HVAC units will be wet-wiped, HEPA vacuumed, and encapsulated with a penetrating encapsulant. All accessible • interstitial spaces will be wet-wiped, HEPA-vacuumed, and encapsulated.

NYC-WTC 000127784

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127784Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127792

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

30 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →