Pre-bid meeting notice for 125 Cedar Street cleaning

Machine-extracted title · confidence 90%

Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.

NYC-WTC_000097066–000097082

Folder label: “125 Cedar

Page image
Scanned page image, NYC-WTC_000097066
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Department of Environmental Protection Bureau of Environmental Compliance WTC Unoccupied Building Monitoring Program 125 Cedar Street Scope of Work Project #WTC_UNA

A MANDATORY PRE-Bill meeting is scheduled for August 28, 2002 at 1:00 P.M. at 125 Cedar Street, Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.

Background

A follow-up visit to 125 Cedar Street revealed debris and significant dust accumulation present on surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.

Purpose

The Monitoring Contractor shall provide; personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories and a penthouse-5,000 to 6,000 square feet per floor). The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.

The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, crystalline silica and mercury.

An accredited laboratory shall perform all sample analyses.

The Work shall be performed 24 hours per day, seven (7) days per week

Contract 'Perm

This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. Contractors must be prepared to mobilize within 72 hours of the contract award.

Air Monitoring/Construction Inspection Services

Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through final air clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.

1 of 5

NYC-WTC 000097066

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097066Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →