Mr Rajappan Radhakrishnan — NYC DEP
21-23 Thames Street Variance Request
Airtek Project 05-0701— June 9, 2005
These materials will be abated last in the decontamination sequence. For detailed
information on the asbestos survey conducted, please refer to the Airtek Asbestos
Survey Report dated May 31, 2005 (Attached).
Structural Framing:
Due to the impossibility of removing structural framing without the risk of
building collapse, all structural framing will be wet-wiped, HEPA vacuumed, and
encapsulated with penetrating encapsulant. As a part of the conventional
demolition that will follow the decontamination, these materials will be
characterized for asbestos content and RCRA characteristics, and will be disposed
of as appropriate based on the test results.
Thank you for your time and consideration,
Sincerely,
Michael Porter
Senior Project Manager
NYS DOL Asbestos Project Designer
MP:bl
NYC-WTC 000127799
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000127799Source: NYC Law Department, mirrored locally
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.