US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134139
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part I: Work Plan — Decontamination/Deconstruction 133-135 Greenwich Street and 21-23 Thames Street Airtek Project 05-0701 — Rev 4 September 29, 2005

21-23 Thames Street:

Main Roof: a. Roof Membrane — 350 sf b. Flashing —150 sf c. Tar — 25 sf d. Coping Stone Caulk —1 sf

1 Floor Roof: a. Roof Membrane —100 sf b. Roof Flashing — 46 sf

Facade: a. Window Caulk —10 sf

Interior: a. Pipe Insulation —57 lf

Per the requirements of the NYCDEP, these materials will be abated last in the decontamination sequence. As such, care will be taken to protect these materials from disturbance and/or damage during the soft-strip phase. Pipe insulation will be removed by NYC DEP Glovebag Procedures. For detailed information on the asbestos survey conducted, please refer to the Airtek Asbestos Survey Reports dated May 31, 2005 (Attachment I).

Following 211d and 3rd cleanings and the settling periods, final air testing will be conducted as detailed in "Clearance Criteria" above. Upon successful clearance air testing, the building will be turned over to the demolition contractor for conventional demolition.

7.4 Structural Framing/Masonry Facade

Due to the impossibility of removing structural framing without the of ri sk

building collapse, all structural framing, and exposed masonry facade will be wet- wiped, HEPA vacuumed, and encapsulated with penetrating encapsulant. Prior to commencement of conventional demolition, the remaining building components (anticipated to be principally wood framing and masonry facade) will be tested by the Environmental Consultant for ACM content and RCRA characteristics, as noted in the WMP (Part IV of the submittal). These materials will be handled and disposed of as appropriate based on the test results.

8.0 Conventional Building Demolition:

8.1 Permits:

8

NYC-WTC 000134139

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134139Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →