RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-45 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION

(d) Bulk and air sampling results/reports shall be submitted directly to the Department upon request -within five calendar days.

§1-45 Action Criteria, (a) When visible emissions occur outside the ■work area, glovebag or tent, or any area air sample has indicated a determi­ nant level of fiber concentrations greater than the larger of baseline levels or 0.01 i/cc, or 0.05 ficc for abatement activities which are part of a pre-demoli- tion abatement activity, work shall stop for inspection.

(1) For large or small asbestos projects, the integrity of barriers, if disturbed, shall be restored. Clean-up of surfaces outside of the work area using HEPA vacuums or wet cleaning techniques shall be done prior to resuming abatement activities.

(2) For glovebag and tent procedures, HVAC systems to or in the work area shall be shut down and the work area shall be wet cleaned or HEPA vacuumed until the area air samples indicate the fiber concentration is below the determinant level. If fiber concentrations remain above the determinant level for longer than 24 hours, isolation barriers and engineer­ ing controls shall be installed and maintained.

(b) Clearance and for reoccupancy criteria. (1) The clearance criteria shall be applied to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfactory when every sam­ ple is less than or equal to 0.01 fZcc or less than the ambient concentration, whichever is larger. (3) For PCM analysis involved in pre-demolition abatement activities, the clearance air monitoring shall be considered satisfactory when every sample is less than or equal to 0.05 tZcc or less than the ambient concentra­ tion, whichever is larger. (4) Por TEM analysis, the clearance monitoring ■'will be considered satisfactory if conducted in accordance ■with 40 CFR Part 763, Subpart E, Appendix A — Section IV — Mandatory Interpretation of Transmission Electron Microscopy Results to Determine Completion of Response Actions.

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

5776 RCNY 5-31-98

cm_21MC100_0 062 42968

NYC-WTC_OOO411837

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411837Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →