NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Summary table of contents: NYS agencies, ENV DEP

Machine-extracted title · confidence 28%

Summary contents for procurement and environmental protection topics; Dept. of Environmental Protection.

NYC-WTC_000359583–000359589
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

-“.Xaitav

shut down and the work area shall be we, cleanerl or HEPA vacuumed unUl the ma air samples indicate the fiber concenuation is below the determinant level. If fiber concentrations remrun above the detenruniuu level for longer diau 24 hours. isolation barriers and engineering controls shall be tiutaUed and maintained.

(b) Clearance and/or reoccupa„cy criteria. (11 The cleamuce criteria shall be applied to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfactory when ewrv sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.

(3) For PCM analysis involved in pre-demolition abatement activities, the clearance air monitoring shall be considered satisfactoty when every sample is less than or equal to 0.Q5 fZee or less than the ambient concentration whichever is larger.

(4) For TEM analysis, the clearance monitoring will be considered satisfactoty if conducted in accordance with 40 CFR Pan 763. Subpart E, Appendix A - Section IV- Mandatoiy Interpretation of Tra,emission Electron Microscopy Results to Determine Completion of Response Actions

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

Subchapter E

Personnel Protection and Equipment Specifications

1 Worker Protection

2 Equipment Specifications

Part 1

Worker Pro urn on

§1-51 Worker Protecticn Requirements

§1-51 Worker Protection Requirements, tai Prior to project initiation, all workers engaged in abatement activities on an asbestos projen di minor project must be certified by DEP.

(b) Al least one asbestos handler supeivsor .shall he present at the work site while abatement activities are being conducted on an asbestos projt\ (

CITY_21MC100_003263073

NYC-WTC_000359584

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359584Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →