NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Participation and procurement guidance, public works

Machine-extracted title · confidence 30%

Index/summary table for Title 11-12 procedures including MWBE participation and environmental chapters.

NYC-WTC_000418802–000418808
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shut down and the work area shaU be wet cleantxt or HEPA vacuumed untU the ^ea air samples indicate the fiber concentration is below the determinant level If fu, .... fiber concentrations remain above the determinant level for longer than 24 hours isolation barriers and engineering controls shaU he instaUed and maintained.

(b) Clearance and/or reoccup^cy criteria. (11 The clearance criteria shall be appUed to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfactoiy- when e\-ery sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.

(3) For PCM analysis involved in pre-demolition abatement activities, the clearance air monitoring shall be considered satisfactory' when every sample is less than or equal to 0.05 f/cc or less than the ambient concentration whichever is larger.

(4) For TEM analysis, the clearance monitoring will be considered satisfactory if conducted in accordance with 40 CFR Pan 763, Subpart E, Appendix A — Section IV— Mandatory Interpretation of Transmission Electron Microscopy Results to Determine Completion of Response Actions.

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

Subchapter E

PersonneJ Protection and Equipment Specifications

1 Worker Protection

2 Equipment Specifications

Part 1

LPorAer Protect io ft

§1-51 Worker Protection Requirements

§1-51 Worker Protection Requirements. (.0 Prim to project initiation, all workers engaged in abatement activities on an asbestos project or minor project must be certified by DEP,

(b) At least one asbestos handler supeivisor shall be pre.sent at the work site while abatement activities are being conducted on an asbestos project

CITY_21MC100_010189108 NYC-WTC_000418806

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418806Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →