Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

2. For PCM analysis, the clearance air monitoring shall be considered satisfactory when each of the 5 inside/5outside samples for Large Projects and/or 3 inside/3outside samples for Small Projects is less than or equal to 0.01 f/cc or the background concentrations, whichever is greater.

3. For TEM analysis, the clearance air monitoring shall be considered satisfactory when the requirements stated in 40 CFR Part 763, Subpart E, Appendix A, Section IV are met.

4. As soon as the air monitoring tests are completed, the Testing Laboratory will send the results of such tests to the City and notify the Contractor.

The Contractor shall cooperate fully with all aspects of air monitoring operations.

1.19 TAMPERING WITH TEST EQUIPMENT

A. All parties to this Contract are hereby notified that any tampering with testing equipment will be considered an attempt at falsifying reports and records to federal and state agencies and each offense will be prosecuted under applicable state and federal criminal codes to the fullest extent possible.

1.20 GUARANTEE

A. Work performed in compliance with this Contract shall be guaranteed for a period of one year from the date the completed work is accepted by the City.

B. The Contractor shall not be held liable for the guarantee where the repair required under the guarantee is a result of obvious abuse or vandalism, as determined by the Commissioner.

C. The City will notify the Contractor in writing regarding defects in work under the guarantee.

Part 2 - PRODUCTS

2J MATERIAL HANDLING

A. Deliver all materials to the job site in their manufacturer's original container, with the manufacturer's label intact and legible.

1. Maintain packaged materials with seals unbroken and labels intact until time of use.

2. Store all materials on pallets, away from any damp and/or wet surface. Cover materials in order to prevent damage and/or contamination.

CAPITAL PROJECT NUMBER PO79201K 02081-46 100: CONTRACT DOCUMENTS REV. May 3,2000 - 46 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_0 06631295

NYC-WTC_000416807

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416807Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →