NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 6 pages

Abatement permit: cleaning procedures, tent and waste

Machine-extracted title · confidence 44%

Permit section detailing bagging, disposal and tent cleanup procedures for asbestos abatement.

NYC-WTC_000429886–000429891
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shut down and the work area shaU be wet cleaneii or HEPA vacuumed until the area air samples indicate the fiber concentration is below the determinant level. If fiber concentrations remain above the determinant level for longer than 24 hours, isolation barriers and engineering controls shall be installed and maintained.

(b) Clearance and/or reoccupancy criteria. (11 The clearance criteria shall be applied to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfacioiy when e\-ery sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.

(3) For PCM analysis involved in pre-demolition abatement activities, the clearance air monitoring shall be considered satisfactory when every sample is less than or equal to 0.05 f/cc or less than the ambient concentration whichever is larger.

(4) For TEM analysis, the clearance monitoring will be considered satisfactory if conducted in accordance with 40 CFR Pan 763, Subpart E, Appendix A — Section IV Mandatory Interpretation ot Transiuission Electron Microscopy Results to Determine Completion of Response Actions

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

Subchapter E

Personnel Protection and Equipment SpeciPications

1 Worker Protection

2 Equipment Specifications

Part 1

IVorAer Protection

§1-51 Worker Protection Requirements

§1-51 Worker Prolection Requirements. (.,1 I’rio, to |.,„iec( inlliadon, all workers engaged in abatement activities on an asbestos project or minor project must be certified by DEP.

(b) At least one asbestos handler supen isor shall be present al the work site while abatement activities are being conducted on an asbestos project.

CITY_21MC100_010223847

NYC-WTC_000429889

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429889Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →