NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 6 pages

Tent abatement cleaning procedures (permit text)

Machine-extracted title · confidence 28%

Abatement permit text detailing waste handling and cleanup procedures.

NYC-WTC_000432325–000432330
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shut down and the work area shall be wet cleaned or HEPA vacuumed until the area air samples indicate the fiber concentration is below the determinant level. If fiber concentrations remain above the determinant level for longer than 24 hours, isolation barriers and engineering controls shall be installed and maintained.

(b) Clearance and/or rcoccupancy criteria. (11 The clearance criteria shall be applied to each homogeneous work area independently.

(2) For PCM analysis involved in alteration or remwation projects, the clearance air monitoring shall be considered satisfactory when es'ery sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.

(3) For PCM analysis involved in pre-demolition abatement activities, the clearance air monitoring shall be considered satisfactory when every sample is less than or equal to 0.05 f/cc or less than the ambient concentration whichever is larger.

(4) For TEM analysis, (he clearance monitoring will be considered satisfactory if conducted in accordance with 40 CFR Pan 763, Subpart E, Appendix A — Section IV— Mandatory Interpretation ot Traintmission Electron Microscopy Results to Determine Completion of Response .Actions.

(5) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.

Subchapter E

Personnel Proieciion and Equipineni SpeciPicaiions

1 Worker Protection

2 Equipment Specifications

Part 1

Worker Prou'cnon

§1-51 Worker Protection Requirements

§1-51 Worker Protection Requirements. (.0 Pi ior m project initiaUon, all workers engaged in abatement activities on an asbestos project or minor project must be certified by DEP.

(b) At least one asbestos handler supeivisor shall he present at the work site while abatement activities arc being conducted on an asbesuxs project.

CITY_21MC100_003111142

NYC-WTC_000432328

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432328Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →