Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

4. Turn off the pump and then the fan(s) when sampling is completed.

5. Collect a minimum number of area samples inside and outside each homogeneous work area (5 inside/5 outside samples for Large Projects and 3 inside/3 outside samples for Small Projects). In addition to the minimum for Large Projects, one representative area samples shall be collected inside and outside the work area for every 5,000 square feet above 25,000 square feet of floor space where ACM has been abated.

P. For post-abatement monitoring, area samples shall conform to the following schedule:

Area Samples for Analysis by Minimum Volume Flow Rate

PCM 1,800 liters 5 to 15 liters/minute TEM 1,250 liters 1 to 10 liters/minute

1. Each homogeneous work area that does not meet the clearance criteria shall be thoroughly recleaned using wet methods, with the negative pressure ventilation system in operation. New samples shall be collected in the work area as described above. The process shall be repeated until the work site meets the clearance criteria.

2. For an asbestos project with more than one homogeneous work area, the release criterion shall be applied independently to each work area.

3. Should airborne fiber concentrations exceed the clearance criteria, the Contractor shall reclean the work area utilizing wet wiping and HEPA- vacuuming techniques. Following completion of recleaning activities, the Testing Eaboratory will perform an obsei-vation of the Work Area. If the Testing Laboratory determines that the work was performed in accordance with the specifications, the appropriate settling period will be observed and additional air sampling will be performed.

4. All costs resulting from additional air tests and observations shall be borne by the Contractor. These costs may include, but are not limited to, labor, analysis fees, materials, and expenses.

5. After the area has been found to be in compliance, the Contractor may remove Isolation Barriers and perform final cleaning as specified.

Q. Clearance and/or Reoccupancy Criteria

1. The clearance criteria shall be applied to each homogeneous work area independently. CAPITAL PROJECT NUMBER PO79201K 02081-45 100: CONTRACT DOCUMENTS REV. May 3,2000 - 45 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631294

NYC-WTC_000416806

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416806Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →