NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-43 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION

Area Samples for Analysis by Minimum Volume Flow Rate PCM 25 mm 560 Liters 5 to 15 liters/min. TEM 25 mm 560 Liters 1 to 10 liters/min. TEM 37 mm 1,250 Liters 1 to 10 liters/min. (2) For glovebag and tent procedures, the selected pump flow rate shall be consistent with the duration of the procedure; however, area sampling pump flow rates shall not be less than 10 liters per minute for the giovebag or tent procedures expected to be completed within 2 hours. In such cases, sampling shall extend beyond the procedure completion to obtain the minimum volume necessary. (f) For glovebag and tent procedures, sampling shall start with glove- bag/tent installation and shall run concurrently with the procedure.

§1-43 Post-Abatement Clearance Air Monitoring. Post-abatement clear­ ance air monitoring requirements are as follows: (a) (1) Sampling shall not begin until a visual inspection confirms that all containerized waste has been removed from work and holding areas and there is no visible ACM debris or residue on or about all abated surfaces; and (2) Sampling shall not begin until at least 1 hour after the area is dry from the third cleaning (see §1-112(e)) and no visible pools of water or condensation remain. For pre-demolition asbestos abatement activity, sampling may begin 1 hour after the area is dry and no visible pools of water or condensation remain. (b) Samplers shall be placed at random around the work area. If the work area contains the number of rooms equivalent to the number of required samples based on floor area, a sampler shall be placed in each room. When the number of rooms is greater than the required number of samples a representative sample of rooms shall be selected. (c) The representative samplers placed outside the work area but within the building shall be located to avoid any air that might escape through the isolation barriers and shall be approximately 50 feet from the entrance to the work area, and 25 feet from the isolation barriers. (d) The following aggressive sampling procedures shall be used within the work area during all clearance air monitoring: (1) Before starting the sampling pumps, use forced air equipment (such as a 1 horsepower leaf blower) to direct exhaust air against all walls, ceilings, floors, ledges and other surfaces in the work area.

5774 RCNY 5-31-98

CITY_21MC100_006242966

NYC-WTC_OOO411835

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411835Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →