§1-43 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION
Area Samples for
Analysis by Minimum Volume Flow Rate
PCM 25 mm 560 Liters 5 to 15 liters/min.
TEM 25 mm 560 Liters 1 to 10 liters/min.
TEM 37 mm 1,250 Liters 1 to 10 liters/min.
(2) For glovebag and tent procedures, the selected pump flow rate shall
be consistent with the duration of the procedure; however, area sampling
pump flow rates shall not be less than 10 liters per minute for the giovebag
or tent procedures expected to be completed within 2 hours. In such cases,
sampling shall extend beyond the procedure completion to obtain the
minimum volume necessary.
(f) For glovebag and tent procedures, sampling shall start with glove-
bag/tent installation and shall run concurrently with the procedure.
§1-43 Post-Abatement Clearance Air Monitoring. Post-abatement clear
ance air monitoring requirements are as follows:
(a) (1) Sampling shall not begin until a visual inspection confirms that
all containerized waste has been removed from work and holding areas and
there is no visible ACM debris or residue on or about all abated surfaces;
and
(2) Sampling shall not begin until at least 1 hour after the area is dry
from the third cleaning (see §1-112(e)) and no visible pools of water or
condensation remain.
For pre-demolition asbestos abatement activity, sampling may begin 1
hour after the area is dry and no visible pools of water or condensation
remain.
(b) Samplers shall be placed at random around the work area. If the work
area contains the number of rooms equivalent to the number of required
samples based on floor area, a sampler shall be placed in each room. When
the number of rooms is greater than the required number of samples a
representative sample of rooms shall be selected.
(c) The representative samplers placed outside the work area but within
the building shall be located to avoid any air that might escape through the
isolation barriers and shall be approximately 50 feet from the entrance to the
work area, and 25 feet from the isolation barriers.
(d) The following aggressive sampling procedures shall be used within the
work area during all clearance air monitoring:
(1) Before starting the sampling pumps, use forced air equipment (such
as a 1 horsepower leaf blower) to direct exhaust air against all walls,
ceilings, floors, ledges and other surfaces in the work area.
5774 RCNY 5-31-98