CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-42
(C) For more than 25 linear feet and less than 260 linear feet, a
minimum of 2 samples (one baseline area sample and one active
abatement area sample) shall be taken in each homogeneous work area.
(ii) For tent procedures where more than 25 linear feet or 10 square
feet of ACM is disturbed, a minimum of three continuous samples shall
be taken concurrently throughout abatement.
(4) For boiler room equipment projects not solely employing the glove
bag and/or tent procedures and not part of a pre-demolition abatement
activity, the procedures outlined in §l-41(c)(l) shall be followed.
(d) Post-Abatement. Post-abatement clearance air monitoring shall in
clude at a minimum the number of area samples specified below, to be taken
inside each homogeneous work area.
(1) For small asbestos projects, a minimum of three.
(2) For large asbestos projects, a minimum of five. In addition to the 5
sample minimum, one representative area sample shall be collected for
every 5,000 square feet above 25,000 square feet of floor space when ACM
has been abated.
(3) When TEM analysis is employed a minimum of 5 samples from
outside the work area shall also be collected.
(4) For small asbestos projects solely employing glovebag procedures,
post-abatement clearance air monitoring is not required, unless the integ
rity of the glovebag was compromised or visible emissions were detected
outside the glovebag and/or levels exceeded 0.01 flee during abatement or
0.05 flee for pre-demolition abatement activities. In such cases, post-abate
ment clearance air monitoring procedures outlined in the applicable subdi
vision of §l-41(d) shall be followed.
§1-42 Monitoring Requirements. Monitoring requirements and proce
dures for other than post-abatement clearance air moni+oring are as follows;
(a) The sampling zone for indoor air samples shall be representative of the
building occupants’ breathing zone.
(b) If possible, ambient samplers should be placed about 6 feet above the
ground surface in reasonable proximity to the building and away from
obstructions and drafts that may unduly affect airflow.
For outdoor samples, if access to electricity and concerns about security
dictate a rooftop site, locations near vents and other structures on the roof
which would unduly affect airflow shall be avoided.
(c) Air sampling equipment shall not be placed in comers of rooms or near
obstructions such as furniture.
(d) Samples shall have a chain of custody record.
(e) (1) In accordance with the above criteria, area samples (see §1-41)
shall conform to the following schedule:
5773 RCNY 5-31-98
CITY_21MC100_006242965
NYC-WTC_000411834