NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

building areas, one of the area samples will be required in these areas to monitor any potential fiber release.

d. Where adjacent non-work areas do not exist, an exterior area sample shall be taken.

e. One area sample within the uncontaminated entrance to each decontamination enclosure system.

f. One area sample within 5 feet of the unobstructed exhaust from each AFD exhausting indoors.

2. Projects Solely Employing Glove-Bag and/or Tent Procedures:

a. One Baseline sample shall be taken near each entrance to the Work Area.

b. Area air samples shall be taken daily no less than 10 feet nor more than 15 feet from the glove-bag(s) or tent(s) actively being used in the abatement, or a similar appropriate and representative distance, using the following guidelines:

3. Glove-Bag Removals:

a. For projects involving more than 25 linear feet and less than 260 linear feet, a minimum of two samples (one baseline and one active abatement area sample) shall be taken in each homogeneous Work Area.

b. For projects involving 260 linear feet or more and less than 500 linear feet of insulation to be removed, a minimum of two samples shall be taken concurrently with the abatement.

c. For projects involving 500 linear feet or greater of insulation to be removed, a minimum of three samples shall be taken concurrently with the abatement, for each 1,000 liner feet of removal.

4. Tent Procedures:

a. For projects involving more than 25 linear feet or 10 square feet, a minimum of three continuous samples shall be taken concurrently throughout abatement.

I. Post-abatement clearance air monitoring for projects not solely employing glove­ bag procedures shall include a minimum number of area samples inside each homogeneous work area and outside each homogeneous work area (five samples

CAPITAL PROJECT NUMBER PO79201K 02081-42 100: CONTRACT DOCUMENTS REV. May 3,2000 - 42 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_0 06631291

NYC-WTC_000416803

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416803Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →