§1-41 TITLE 15—DEPT, OF ENVIRONMENTAL PROTECTION
(1) For asbestos projects not solely employing the glovebag and/or tent
procedures, area air sampling shall be performed at the following locations:
(i) Two area samples outside the asbestos project work area in uncon
taminated areas of the building, remote from the decontamination facili
ties.
(A) Primary location selection shall be within 10 feet of isolation
barriers.
(B) Where negative ventilation exhaust ducting runs through un
contaminated building areas, one of the area samples will be required
in these areas to monitor any potential fiber release.
(C) Where adjacent non-work areas do not exist, an exterior area
sample shall be taken; and
(u) One area sample within the uncontaminated entrance to each
worker decontamination and waste decontamination enclosure system;
and
(hi) One area sample within 5 feet of the unobstructed exhaust from
a negative pressure ventilation system exhausting indoors.
(2) For abatement projects at demolition sites not solely employing
, glovebag and/or tent procedures, area air sampling shall be performed at
the following sampling locations;
(i) One area sample taken outside the work area within 10 feet of
isolation barriers; and
(ii) One area sample taken within the uncontaminated entrance to
each worker decontamination and waste decontamination enclosure sys
tem.
(hi) One area sample within 5 feet of the unobstructed exhaust from
a negative pressure ventilation system exhausting indoors.
(3) For glovebag and tent procedures, one baseline area sample shall be
taken near each entrance to the work area. Area air samples shall be taken
daily no less than 10 feet nor more than 15 feet from the glovebag(s) or tent
actively being used in the abatement, or a similar appropriate and repre
sentative distance, using the following guidelines:
(i) For glovebag procedures;
(A) For more than 260 linear feet and less than 500 linear feet of
pipe lagging to be removed — a minimum of two continuous samples
shall be taken concurrently with the abatement.
(B) At least 500 linear feet of pipe lagging to be removed — a
minimum of three continuous samples shall be taken concurrently with
the abatement, for each 1000 linear feet of pipe lagging removal.
5772 RCNY 5-31-98