Asbestos Abatement
L. Competent person shall conduct inspections and provide written reports daily.
Inspections will include checking the standard operating procedures, engineering
control systems, respiratory protection and decontamination systems, packaging
and disposal of asbestos waste, and any other aspects of the project which may
effect the health and safety of the people and environment.
M. All costs for required air monitoring by the Contractor's competent person shall
be borne by Contractor.
N. The City reserves the right to conduct air and surface dust sampling in
conjunction with and separate from the Testing Laboratory for the purposes of
Quality Assurance.
O. All samples shall be accompanied by a Chain of Custody Record that shall be
submitted to the Resident Engineer upon completion of analysis.
1.18 TESTING LABORATORY
A. The City, at its own expense, will employ the services of an independent Testing
Laboratory. The Testing Laboratory will perform air sampling activities at the site
and perform periodic observations of the Work Site.
B. The Laboratory will perform analysis of air samples utilizing phase contrast
microscopy (PCM) and/or transmission electron microscopy (TEM). This
laboratory shall meet the standards stated in Paragraph 1.18.
C. Observations will include, but not be limited to, checking the standard operating
procedures, engineering control systems, respiratory protection, decontamination
systems, packaging and disposal of asbestos waste, and any other aspects of the
project that may effect the health and safety of the environment. Contractor,
and/or facility occupants.
D. The Testing Laboratory shall have access to all areas of the asbestos removal
project at all times and shall continuously inspect and monitor the performance of
the Contractor to verify that said performance complies with this Specification.
The Testing Laboratory shall be on site throughout the entire abatement
operation.
E. The City will be responsible for costs incurred with the required laboratory work.
Any subsequent additional testing required due to limits exceeded during initial
testing shall be paid for by the Contractor.
F. At a minimum, air sampling shall be conducted in accordance with the following
schedule:
Abatement Activity Pre
Abatement
CAPITAL PROJECT NUMBER PO79201K 02081-40
100: CONTRACT DOCUMENTS REV. May 3,2000
- 40 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631289
NYC-WTC_000416801
OCR can misread numbers and units. Confirm readings against the page image before using them.